Laserfiche WebLink
Task 7 <br />a. ('orraan ssrau>n 'S_ltirt -up Elcporv. <br />Acceptance testing results, including required corrective action phuas to address any <br />lroceliarrraanc `Iuncfiamaat deficiencies, shall be submitted to the City for review and comment. <br />Task tt <br />a. Pro rarratrainr Guideline: <br />A prograrunring guideline document shrill be submitted for review and comment by the City. <br />This deliverable shark include standardized programming procedures and parameters as <br />described in the scope of work. Base programming files shall be included. <br />Task 9 <br />a. N''A <br />V. MIN IMUMQUALIFICATIONS <br />The City is :searching Corr a highly experienced engineedengincering firm with specific experience in control <br />s,ystorn, H.Ml, and SC'ADA system development, test, integration, and commissioning. <br />C'alitiania CSF PC, El-" PE, or ISA CAP certification required. Provide licenNelcerLifieation holder <br />informalion (i,e., name, ticenso #, etc.). <br />Project P:xperieuce. <br />n Demonstrated experience with PLC, HNIT, RTU and communication processors (c..g- Schneider! <br />Telemecanique Modicon PLCs, and fulagclis HMI) in a 'variety of dc,vulopment environments <br />(e.g,. Concept v2.6 and U'nityPro). <br />r, Proven experience with :KADA conrmunication protocols and concepts. <br />* Demonstrated experience in the area of control systems design, development, integration, <br />aecelltance tcsfing and commissioning. <br />r., Minimum of three projects of similar scale Mid Scope in the muaiciptal water <br />product :ianichstributi Oil industry within the past five years. <br />* Strong written and verbal communication capabilities; provide 3 references. <br />Provide detailed prpjcet descriptions liar represenuaive projects; include contact information for <br />clicnticustorner personnel ( pruject mrcnager, engineer, etc.) involved with each representative project. <br />Sufficient resources, to staff this prooject. Provide resumes for key personnel/sub- contractors and a. <br />resource table summarizing the availability ofassigned individuals forthe project,. <br />VI. SUB-CONTRACTORS <br />All ,subcontractors) shall he idcntifiied in the hid propostd. Subcontractors shall be the responsibility of <br />the successful proposer and Lhe City shall assume no liability of such subcontractors. <br />_�_.__� City of Santa .Ana F,FP 15 -105 -- <br />2511265 <br />