My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - PUMP STATION SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
25I - AGMT - PUMP STATION SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 5:05:15 PM
Creation date
1/14/2016 2:24:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On an as-needed basis, Consultant siiatll provide operational and prograunruiug suplrort .for anther <br />Water production System facilities. Sixty (60) hotu °s ol'suppawrl are anticipated for this task. <br />Iti(!Y PROJECT DELIVER,+BLES <br />Fask f <br />a. Site Audiffechnical lv emorarndurn: <br />The "Site MOW' work sessions shall follow with a summary ol`harrdwvar c assessment <br />findings, This Tint will provide recommendations assockated with hardware upgrades and <br />standardization. <br />b, lnstt2uncnt Dawha c: <br />A list of all existing hardware and configuration details shall be submitted for review and <br />comment by the City. A separate list orany proposed hardware shall also be included (this <br />list shall identify which piece orltnrdwvam that it will be superseding). 'rho format and <br />proposed fields shall he approved by the City prior to dovclopncnt /submittal of this database. <br />c. 110 Database: <br />A list of all system 1/0 and Conlin Lin ica lions inie0aces shall be stz witted for review and <br />coanLrtent by the City. The ler imit and proposed fields shall be approved by (Pre City prior to <br />developmen(lsubrrrittal of this database, <br />r:ask 2 <br />at. Site f) eatttions Technical Momoratndunr: <br />The "Site Operations" work sessions shall follow with a field st nmary for review a ud. <br />CoCnCnent by the City, The memorandum will include an organized summary orexis ing <br />operating procedures. The "1'M shall also inaandc recommendations For improvements to <br />system practices and procedures. <br />Task 3 <br />a. N/A <br />Tash 4 <br />a. Functional S geiflicaticrrr_ <br />A functional specification, as described in €he scope above, shall be submitted for revieNN, and <br />comment by the City, The Inrarnat and contrnt outline shall be approved by the City prior to <br />final ticvchrpnsenkisuhrr ikti €. <br />Task 5 <br />a. FAT7SAr protocols: <br />Acceptance testing protocols and criteria for all control systorn submittals associated with the <br />planned Walaut Station improvements will be submitted to the City for review and comment. <br />'rastc tr <br />a. FATISr'AT Results Re rent s <br />Acceptance testing results, including required corruetive action plans to address Lilly <br />performance/ f nrctional deficiencies;, shall be submitted to the City for review and comment. <br />of Santa Ana RFP 15-1 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.