Laserfiche WebLink
ASSESSMENT DISTRICT NO. 2015.01 <br />(WARNER INDUSTRIAL COMMUNITY) <br />respective parcels and subdivisions of land within said District as the same <br />existed at the time of the passage of Resolution of Intention, each of which <br />subdivisions of land, parcels, or lots respectively have been given a separate <br />number upon said Assessment Diagram and In the Assessment Roll. <br />3. The subdivisions and parcels of land with the numbers therein as shown on <br />the respective Assessment Diagram as attached hereto correspond with the <br />numbers appearing on the Assessment Roll as contained in Appendix B. <br />NOTICE IS HEREBY GIVEN that bonds to represent unpaid assessments <br />and bearing interest not to exceed the current legal maximum rate of twelve <br />percent per annum, may be issued in the manner and form provided in Part 6, <br />Division 10, of the Streets and Highways Code of the State of California (the <br />Improvement Bond Act of 1915), and the last installment of said bonds shall <br />mature a maximum of twenty years from the second day of September next <br />succeeding twelve months from the issue date of the bonds. <br />5, By virtue of the authority contained in the Municipal Improvement Act of 1913, <br />and by further direction and order of the Santa Ana City Council, 1 hereby <br />make the following assessments to cover the costs and expenses of the <br />works of improvement for the Assessment District based on the costs and <br />expenses as set forth below: <br />As Preliminarily <br />6. The Methodology of Assessment Spread is set forth herein. <br />Dated this �JfiK day cf -JAtJUAA- 20. % <br />PSOMAS <br />r A / <br />is rio. 25737 mvbHAEL D. SWAN C 25737 <br />Exp. t2 -31 -17 ASSESSMENT ENGINEER <br />or G <br />16 <br />55B -34 <br />Approved As Modified Final <br />Estimated Construction Costs <br />$5,206,915 <br />Estimated Contributions <br />($3,033,415) <br />Estimated Financing Costs <br />$859,915 <br />Balance to Assessment <br />$3,033,415 <br />6. The Methodology of Assessment Spread is set forth herein. <br />Dated this �JfiK day cf -JAtJUAA- 20. % <br />PSOMAS <br />r A / <br />is rio. 25737 mvbHAEL D. SWAN C 25737 <br />Exp. t2 -31 -17 ASSESSMENT ENGINEER <br />or G <br />16 <br />55B -34 <br />