My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - RESIDENTIAL STREET REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
23A - PROJ - RESIDENTIAL STREET REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:29:21 PM
Creation date
1/28/2016 3:18:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/2/2016
Destruction Year
2021
Document Relationships
EBS GENERAL ENGINEERING INC.
(Related to)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA RE -BID <br />PROPOSAL <br />PROJECT NO. 16 -7523 <br />WASHINGTON SQUARE RESIDENTIAL STREET REPAIR. <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: EBS GENERAL ENGINEERING INC <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule; <br />Itent <br />Description <br />Unit <br />Qty <br />Unit Price Amount <br />1 <br />Mobilization (Not to Exceed 10 %of Total <br />Contract) <br />LS <br />1 <br />$ y/ <br />$ <br />$$ <br />2 <br />Unclassified Excavation* <br />Cy <br />500 <br />�7 <br />3 <br />AC Pavement *F' <br />TN <br />120 <br />- <br />$�2� /�,y, <br />' C✓t <br />4 <br />Aggregate base* <br />TN <br />960 <br />5 <br />Removal of 6" PCC at Various Locations* <br />Cy <br />1,200 <br />$ <br />6 <br />Construct 6" PCC with (3 -day) Cure <br />`�'oa <br />including Dowels* <br />Cy <br />1,100 <br />$. 10,a) $(23) o6 <br />7 <br />Crack Seal with DeerySuper Gray* <br />LF <br />43,000 <br />s <br />8 <br />Construct PCC Curb Ramp* <br />SF <br />6,800 <br />$ <br />9 <br />Construct PCC Driveway Approach (T =6 ") <br />* <br />SF <br />4,500 <br />$ <br />10 <br />Construct PCC Curb (B -1) * <br />LF <br />300 <br />$ <br />11 <br />Construct PCC Curb and Gutter(A -2 -6) * <br />LF <br />1,800 <br />$ <br />. �) 0() $ b pw. <br />12 <br />Construct PCC Cross Gutter* <br />SF <br />7,900 <br />$ <br />, <br />13 <br />Construct PCC Sidewall<* <br />SF <br />5,000 <br />/ f <br />14 1 <br />Grind PCC * <br />LF <br />600 <br />$< $ <br />P -1 of P-25 <br />23A -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.