My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - RESIDENTIAL STREET REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
23A - PROJ - RESIDENTIAL STREET REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:29:21 PM
Creation date
1/28/2016 3:18:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/2/2016
Destruction Year
2021
Document Relationships
EBS GENERAL ENGINEERING INC.
(Related to)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA RF -BID <br />PROPOSAL <br />PROJECT NO, 16 -7523 <br />WASHINGTON SQUARE RESIDENTIAL STREET REPAIR <br />Item <br />Description <br />Unit <br />Qty <br />17nitRrice <br />Amount <br />15 <br />Root Shave* <br />EA <br />80 <br />$ �, 0.1 <br />U <br />$ 00 , <br />16 <br />Adjust Sewer Manhole Frame and Cover <br />to Finished Grade* <br />EA <br />20 <br />17 <br />Furnish and Install Water Valve Frame <br />and Cover to Grade* <br />EA <br />20 <br />$ 5 W <br />1 <br />$ f <br />18 <br />Signing and Striping <br />LS <br />1 <br />$ Q„ , eCli <br />$li(aclb <br />19 <br />Temporary Construction Sign <br />EA <br />2 <br />$� ( <br />$< <br />W <br />20 <br />SWPPP <br />LS <br />1 <br />$ " Sl.r ib <br />a it <br />$ <br />TOTAL BASE BID $ Stl <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, ail, or none of the add - alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only, This bid item shall not be <br />subject to the "25 %" limit as stated in Section 3 -2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly, <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within forty (50) working days after the commencement date stated in the Notice <br />to Proceed. The bidder also proposes to continue in a diligent and workman -like manner without <br />interruption, and to complete the construction thereof within the time specified above. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6 -9 of the <br />Standard Specifications, shall be $1,500 per calendar day. <br />Name of Firm EBS GENERAL ENGINEERING INC <br />Signature of BIDDER <br />Title JOSEPH A NANCI, PUSIDENT <br />(If an individual, so state, If a firm or co- partnership, state the firm name and give the names of <br />all individual co- partners composing the firm. If a corporation, state legal name of corporation, <br />and manes of President, Secretary, Treasurer and Manager, thereof.) <br />P -2 of P -25 <br />23A -11 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.