My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - RESIDENTIAL STREET REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
23A - PROJ - RESIDENTIAL STREET REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:29:21 PM
Creation date
1/28/2016 3:18:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/2/2016
Destruction Year
2021
Document Relationships
EBS GENERAL ENGINEERING INC.
(Related to)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award For Construction of Washington Square <br />Residential Street Repair FY 15 -16 <br />February 2, 2016 <br />Page 2 <br />bid package. As a result, the bids opened on December 1, 2015, were incomplete. Therefore, to <br />keep the project eligible for the programmed federal funds, rebidding was necessary. The project <br />was advertised again on December 8 and 15, 2015, and bids were opened on December 30, <br />2015. The following is a summary of the bid invitations made and the bids received: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />14 <br />Contractors requesting bidding documents <br />10 <br />Bids received <br />4 <br />Bids received from Santa Ana contractors <br />1 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID AMT <br />1 <br />EBS General Engineering Inc. <br />Corona <br />$984,925 <br />2 <br />Hardy & Harper Inc. <br />Santa Ana <br />$1,111,000 <br />3 <br />Excel Paving Inc. <br />Long Beach <br />$1,287,142 <br />4 <br />CS Legacy Construction, Inc. <br />Pomona <br />$1,333,253 <br />Four bids were received and considered responsive, with EBS General Engineering Inc. <br />submitting the lowest responsive bid (Exhibit 2). The base bid amount of $984,925 is below the <br />engineer's estimate of $1,528,048. Based on the bids received, staff recommends award of this <br />contract to EBS General Engineering Inc. <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & <br />Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City <br />assets), Strategy B (equitably maintain existing streets and associated assets in a state of good <br />repair so they are clean, safe, and aesthetically pleasing for all users), and Strategy G (develop <br />and implement the City's Capital Improvement Program in coordination with the Community <br />Investment Plan (e.g., neighborhood streets, traffic improvements, etc.). <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions are <br />exempt from further review. Categorical Exemption Environmental Review No. 2015 -29 was filed <br />for these projects. <br />23A -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.