My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR THE HERITAGE 2001 E DYER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
75A - PH - EIR THE HERITAGE 2001 E DYER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:39:05 PM
Creation date
1/28/2016 4:04:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
2/2/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
El No. 2015 -01, AA No. 2014 -04, <br />GPA No. 2015 -03, DA No. 2015 -03 & VTTM No. 2015 -03 <br />October 12, 2015 <br />Page 5 <br />The landscaping concept for The Heritage has been designed to complement the proposed <br />structures. The concepts will assist in unifying the structures through a consistent landscape <br />program. In addition to the 1.26 -acre central park, a system of bicycle and pedestrian trails would be <br />incorporated into the project site. Elements such as water fountains, special hardscape and <br />landscape features such as outdoor seating, lighting, and special pavement treatments will <br />highlight the retail area and sidewalks. A diverse and drought tolerant landscape palette will also <br />be provided throughout the project to accent and enhance the various architectural elements of the <br />project (Exhibit 10). <br />Protect Backaround <br />In 1972, the City Council approved Minor Exception No. 1972 -22, which allowed the construction <br />of a 356,000 square foot industrial building on the site with less than required parking. Since its <br />completion, the building has been occupied by a variety of large -scale warehouse and furniture <br />manufacturing uses, with a bicycle manufacturing facility the prior long -term use that vacated the <br />site in the early 2000's. More recently, the office component of the building has been occupied by <br />a data center, which utilizes approximately 10,000 square feet, with various short term uses <br />occupying the warehouse section of the building. <br />General Plan and Zoning Analysis <br />The General Plan land use designation for the site is Professional and Administrative Office (PAO), <br />which allows predominantly office uses along with support commercial and retail uses. The <br />proposed project is not consistent with this General Plan land use designation. The applicant is <br />requesting a General Plan Amendment for this project that would change the current land use <br />designation to District Center (DC) with a maximum Floor Area Ratio (FAR) of 1.70, which would <br />make the project consistent with the General Plan. <br />The subject site is located in the Light Industrial (M -1) zoning district. The M -1 zoning designation <br />allows uses such as warehouses, wholesale operations and manufacturing uses as well as support <br />commercial businesses. The project site is not consistent with the zoning designation. An <br />amendment application (zone change) to change the zoning designation to a Specific <br />Development (SD) is proposed for this project, which would make the project consistent with the <br />new SD zoning designation. <br />It must be noted that while the project is inconsistent with the current General Plan and Zoning <br />designations, this area of the City is currently being considered for rezoning by staff to a high <br />density mixed -use zone. <br />75A -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.