My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP INC. - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
BUCKNAM INFRASTRUCTURE GROUP INC. - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 6:45:48 AM
Creation date
2/19/2016 11:03:45 AM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP INC.
Contract #
A-2015-290
Agency
PUBLIC WORKS
Council Approval Date
12/15/2015
Expiration Date
12/31/2016
Insurance Exp Date
9/16/2018
Destruction Year
2022
Notes
Amended by A-2015-290-01
Document Relationships
BUCKNAM INFRASTRUCTURE GROUP INC. 1 - 2015
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Beed / Scope of Work <br />Project Manager and key staff members from the Engineering and Street Maintenance <br />departments. Project success is created by delivering on three main factors; <br />1) Adherence to scope tasks and deliverables <br />2) Performing to the standard set by the Project Schedule; and <br />3) Controlling costs. Our Project Manager will follow each of these factors throughout <br />the duration of the project <br />Deliverable: Project Status Updates, as stated in Task 1.2 <br />TASK 1.2., Update Maintenance and Rehabilitation History <br />Bucknam will review all city provided maintenance projects that have been completed since the <br />last major PMP update (i.e. 2014). These records will be assessed and entered into MicroPAVER. <br />Our staff will generate an updated work history report for City review and compliance. The City <br />will provide Buckram with the most recent PAVER 7.0 database (.00 file). <br />Deliverable: Citywide Work History Report <br />TASK1.3. Conduct pavement Condition Survey <br />Once the pavement segmentation has been assessed and <br />verified, the inspection of approximately 105 MPAH centerline <br />miles will be performed per ASTM D6433-11 and OCTA <br />guidelines. <br />City of Santa Ana Street System Network! <br />MPAH —105 centerline miles (2016 survey) <br />o Survey will exclude private streets, Orange <br />County unincorporated areas and State <br />Highways <br />o Recently slurry seal and overlay maintenance will reduce the amount of <br />necessary survey, Bucknam will coordinate mileage and cost reduction with City <br />prior to survey <br />o For FY 2016 Santa Ana is only required to survey their MPAH pavement sections <br />Our survey methodologies will include the following approach based on the City's cost and <br />benefit analysis: <br />1. Walking (Recommended) based MicroPAVER / ASTM D6433-11 survey (performed on <br />Tablets live in the field); this survey methodology is required by OCTA. Our staff will <br />establish all inspection sample locations for survey based on MicroPAVER / OCTA <br />January 2016 guidelines. <br />3-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.