My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP INC. - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
BUCKNAM INFRASTRUCTURE GROUP INC. - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 6:45:48 AM
Creation date
2/19/2016 11:03:45 AM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP INC.
Contract #
A-2015-290
Agency
PUBLIC WORKS
Council Approval Date
12/15/2015
Expiration Date
12/31/2016
Insurance Exp Date
9/16/2018
Destruction Year
2022
Notes
Amended by A-2015-290-01
Document Relationships
BUCKNAM INFRASTRUCTURE GROUP INC. 1 - 2015
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work <br />reference and use as well as presented in a way that is beneficial for elected <br />management. <br />This report will assist the City in complying with OCTA and its most recent Countywide PMP <br />Guideline requirements. The report will be prepared in a format that uses the information <br />delivered by MicroPAVER in conjunction with the information and analysis performed by our <br />team. The report will also provide the City with information on: <br />■ Current inventory and pavement conditions indices (PCI) for all road classes <br />■ Projected annual rehabilitation programs for street maintenance for a 7 -yr period <br />(ARTERIAL and LOCAL Forecast Maintenance Reports) that show the largest return on <br />Investment and acceptable levels of service <br />■ Modeling and comparison of budget scenarios typically include: <br />• Maintenance required to complete all streets within 7 -years <br />■ Current /Actual budget projection (citywide approach) <br />• 7 -year CIP projection budget for OCTA submittal requirements <br />■ Final Local Match Reduction !budgetary models / results <br />• Strategies and recommendations fertile City's AHRP, Measure M and maintenance <br />programs and procedures, including a preventative maintenance schedule <br />• Supporting documentation required by OCTA <br />• A detailed breakdown of deferred maintenance (backlog) <br />Our OCTA PMP submittals have been well received by OCTA and are formatted in such a way for <br />easy review and acceptance. Our staff will include within the draft/final report the following <br />minimum data: <br />A) Average PCI for: <br />a) Entire pavement network <br />b) MPAH Roadways <br />c) Local streets <br />B) Projected PCI under existing funding levels over the next seven years for: <br />a) Entire pavement network <br />b) MPAH Roadways <br />c) Local streets <br />C) Seven -yr plan for road maintenance and rehabilitation, identifying street sections <br />selected for treatment, based on the existing budget. <br />a) Street name, limits of work, length, widths and pavement areas <br />by Functional classification <br />c) PCI and most recent date of inspection <br />3-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.