My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP INC. - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
BUCKNAM INFRASTRUCTURE GROUP INC. - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 6:45:48 AM
Creation date
2/19/2016 11:03:45 AM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP INC.
Contract #
A-2015-290
Agency
PUBLIC WORKS
Council Approval Date
12/15/2015
Expiration Date
12/31/2016
Insurance Exp Date
9/16/2018
Destruction Year
2022
Notes
Amended by A-2015-290-01
Document Relationships
BUCKNAM INFRASTRUCTURE GROUP INC. 1 - 2015
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) Type and cost of treatment <br />D) Alternative funding levels required to: <br />a) Maintain existing weighted average network PCI <br />b) Improve weighted average network PGI <br />E) Backlog by FY of unfunded pavement rehabilitation, restoration and reconstruction. Total <br />amount of backlog will be included in summary tables <br />F) Pavement Management Program Certification form <br />We will make a presentation of the results from the 2016 PMP update to City personal and/or <br />City Council if necessary (pro -Bono): <br />Registered Engineer <br />Mr. Steve Bucknam, P.E. will supervise all operations, review all completed data and prepare <br />and sign a final report incorporating the results of our pavement evaluation and conditions, We <br />will provide engineered recommendations for pavement rehabilitation and replacement design <br />based upon field data and analysis. <br />Deliverable. Digital file on CD, one (1) hardcopy of the Final Pavement PMP, in binder and <br />electronic form (.pdf), will be sent to the city. Bucknam will provide one (1) copy of <br />MicroPAVER .e65 file on CD as well as all M&R, survey and budget analysis data. <br />rr_1 if"# IA f x <br />If needed and per the City's request, Local streets (317 centerline miles) will be surveyed. Our <br />methodology for project administration, data assessment, pavement survey and reporting will <br />be identical to the scope of work shown above for the MPAH network. <br />TASK 3.1 through 3.3 (Alley Network): <br />If needed and per the City's request, Alley streets (28 centerline miles) will be surveyed. Our <br />methodology for project administration, data assessment, pavement survey and reporting will <br />be identical to the scope of work shown above for the MPAH network. It is noted that work <br />histories will be excluded from this effort. <br />Additionally, the City has requested that the alley network/sections that are currently within the <br />Santa Ana PAVER 6.5 database be cross-checked and verified against the City's GIS pavement <br />layer. This effort will include the verification of alley segments, naming conventions, dimension <br />accuracy and the organization of Branch / Section ID's in logical sequences (i.e. alphabetical, <br />geographical, etc.), <br />TASK4.1: Automated Digital Roadway Imaging <br />Buckram has performed numerous digital roadway imaging survey throughout Southern <br />Callfnornia over the past fifteen years. Based on the City's infrastructure / GIS data collection <br />3-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.