Laserfiche WebLink
Statement of Facts and Findings <br />Based upon its review of the EIR, the Lead Agency finds that the EIR is an adequate assessment of the <br />potentially significant environmental impacts of the project, represents the independent judgment of the <br />City, and sets forth an adequate range of alternatives to this project. <br />2.0 Project Description <br />The proposed project would redevelop the project site to provide a mixed -use development consisting of a <br />total of 1,221 multi- family apartments in the upper three floors of three five -story buildings; commercial <br />retail space on the bottom two floors; retainment of the existing office uses, and provision of park and <br />recreation open space and facilities. The proposed land uses would require a General flan Amendment from <br />the existing land use designation from PAO (Professional and Administrative Office) to District Center. In <br />addition, a zone change from M -1 (Light Industrial) to a Specific Development designation would be <br />required. <br />The tallest point on the proposed five -story ruixed -use buildings world be 67 -feet 6- inches from ground <br />level. Areas of the first and second floors of these three buildings would be developed to provide <br />commercial retail space totaling 12,675 square feet and restaurant space totaling 5,415 square feet. <br />The multi - family units would be for rental purposes and would be developed at a density of 65 dwelling <br />units per acre (etu/ac) (1,221 total units on 18.84 acres). The residential units would range in size from <br />512 square foot studios to 1,290 square foot one, two, and three- bedroom Emits, and would have between 41 <br />square feet and 71 square feet of outdoor terrace area. <br />The existing 366,000 square foot office /warehouse building would be reduced in size by removing the <br />warehouse space. The two -story 56,000 square foot office building and associated surface parking that <br />provides 102 spaces would be reconfigured. hi addition, the exterior of the office building would be <br />remodeled and the existing emergency generator for the data center would be relocated from its existing <br />location to another location o:nsite. <br />Architecture and Design <br />The proposed architectural design of the project would provide a complete community by integrating the <br />buildings, public spaces, and green spaces. Each building would provide a unique, but similar to one <br />another, contemporary and modern architectural expression. The proposed design colors are earth tones, <br />including off- white, beige, brown, grey color shades. The ground floor retail uses and common areas would <br />be developed as pedestrian - oriented frontages. In addition, the site design would also include <br />pedestrian/bicycle paths to provide for non - vehicular onsite circulation. <br />Open Space / Recreation <br />The proposed proj ect includes both public and private (for residents) open space and recreational facilities <br />on the proj ect site. A 1.01 -acre public central park would be developed in the northern portion of the project <br />site. The central park area would include an outdoor theatre, public art/sculpture, playground, and walking <br />paths that would comiect to the open space along the northern and eastern boundaries of the project site. The <br />open space along the northern and eastern boundaries of the project site would provide a putting green, a par <br />The Heritage Mixed W. PmJ..1 2 ESA) 140730 <br />Statement of Facts and Findings September 2010 <br />