My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:19:29 PM
Creation date
3/22/2016 10:41:34 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING INC.
Contract #
16-7523
Agency
Public Works
Council Approval Date
2/2/2016
Notes
Projects Linked- RFCA
Document Relationships
23A - PROJ - RESIDENTIAL STREET REPAIR
(Related to)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2016\02/02/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Federally Required Documents to be Submitted with Your Bid Proposal <br />Packet <br />Specific federal requirements must be met for this U.S. Department of Housing and Urban Development <br />(HUD) funded project. <br />The City of Santa Ana's Contact: <br />Community Development Agency <br />City of Santa Ana <br />20 Civic Center Plaza, M-25 <br />Santa Ana, CA 92701 <br />Phone(714)647-5445 Fax(714)647-6549 <br />www.sania-ana.org/ <br />11161 - -MRL WKI <br />-MODIMbIXTO "to) oil] K" 0 to I W1091 lki *11" 1 R QIUV I DOOM <br />The following document(s) MUST be fully filled out and submitted with the bid nro on sal ac a e: <br />• Proof of registration in the System forAward Management(www, sam.eov) to be filed by contractor <br />• Proof of registration in the D&B Data Universal Numbering System <br />(httoc /�tdo[late dub cam/iUardate%amnatlNdaok <br />• Section 3 Contract Clause (Exhibit 1). To be filed by contractor. <br />• New Hire Calculation Form (Exhibit 2). To be filed by contractor. <br />• Contractor's Section 3 Affirmative Action Plan (Exhibit 8) with proof of publication. To be filed by <br />contractor. <br />• Section 3 Contract Award Considerations (Exhibit 9) with progf of publication. Tobe filed by <br />contractor. <br />• Women/Minority Business Owned Enterprises Goof Faith Ef%orts (Exhibit 12). To be filed by <br />contractor. <br />• Noncollusion Affidavit (Exhibit 15). To be filed by contractor. <br />• Federal Lobbyist Requirements Certification (Exhibit 16). To be filed by contractor. <br />• Certification and Understanding ofAuthorization (Exhibit 17). To be filed by contractor and <br />subcontractor(s). <br />• <br />*Additional Wage Rate Classification.' If the contractor needs an additional job classification, the <br />contractor must submit with the bid package a written, signed request naming the work <br />classification(s) and the wage rate(s), including any fringe benefits that are proposed. <br />The following document(s) shall be completed by the contractor and/or subcontractor(s), as specified, and <br />filed with the City's Labor/Section 3 Contact prior to award of contract on the project: <br />• Proof if registration in the System for Award Management(www yam wi to be filed by <br />subcontractor(s) <br />• Section 3 Contract Clause (Exhibit 1). To be filed by subcontractor <br />• Project Wage Rate Sheet. To be filed by contractor and any subcontractor(s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.