My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:19:29 PM
Creation date
3/22/2016 10:41:34 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING INC.
Contract #
16-7523
Agency
Public Works
Council Approval Date
2/2/2016
Notes
Projects Linked- RFCA
Document Relationships
23A - PROJ - RESIDENTIAL STREET REPAIR
(Related to)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2016\02/02/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA RE -BID <br />PROPOSAL <br />PROJECT NO. 16-7523 <br />WASHINGTON SQUARE RESIDENTIAL STREET REPAIR <br />Item <br />Description <br />Unit <br />Qty <br />Unit Price <br />Amount <br />15 <br />Root Shave* <br />EA <br />80 <br />$ 00 <br />$ �(✓(J, �f <br />V <br />16 <br />Adjust Sewer Manhole Frame and Cover <br />to Finished Grade* <br />EA <br />20 <br />$ "C" <br />j <br />$ - <br />17 <br />Furnish and Install Water Valve Frame <br />and Cover to Grade* <br />EA <br />20 <br />$ y� <br />.� ,J,Ws <br />$ <br />(J J <br />70 <br />18 <br />Signing and Striping <br />IS <br />1 <br />$$ <br />sC <br />$3)boo f <br />C1b <br />19 <br />Temporary Construction Sign <br />EA <br />2 <br />20 <br />SWPPP <br />LS <br />1 <br />$ ,. Cr <br />$, r� <br />TOTAL BASE BID <br />$ <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within forty (50) working days after the commencement date stated in the Notice <br />to Proceed. The bidder also proposes to continue in a diligent and workman -like manner without <br />interruption, and to complete the construction thereof within the time specified above. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $1,500 per calendar day. <br />Name of Firm EBS GENERAL ENGINEERING INC <br />Signature of BIDDER —4 <br />Title JOSEPH A NANCI, <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-2 of P-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.