Laserfiche WebLink
Mater Dei High School <br />(9) Parking Structure and School Expansion Project <br />Environmental Impact Report <br />Applicant shall demonstrate to the City Engineer how the project operations subject <br />to that specification during hauling activities shall comply with the provisions set <br />forth in Sections 23114(b)(1), (e)(4). <br />AQ -3 Prior to issuance of any Grading Permit, the City Engineer and the Building Safety <br />Manager shall confirm that the Grading Plan, Building Plans, and specifications <br />stipulate that, in compliance with SCAQMD Rule 403, 03 precursor emissions from <br />construction equipment vehicles shall be controlled by maintaining equipment <br />engines in good condition and in proper tune per manufacturer's specifications, to <br />the satisfaction of the City Engineer. Maintenance records shall be provided to the <br />City by the construction contractor on a monthly basis. The City Inspector shall be <br />responsible for ensuring that contractors comply with this measure during <br />construction. <br />Localized Air Quality Impacts. Development associated with the project would not result in <br />significant localized emissions impacts or expose sensitive receptors to substantial pollutant <br />concentrations. <br />Findings <br />Changes or alterations bane been required in, or incorporated into, the project, which avoid or snbstantiedyl <br />lessen the significant environmental qfect as identified in the Drafd EIR <br />2. The e §eas identified in the D raft EIR have been determined not to be Si in scant: <br />Facts in Support ofFindinbas <br />The potential impacts from localized air quality emissions have been eliminated or substantially <br />lessened to a level of less than significant by virtue of the mitigation measures identified in the Draft <br />EIR. <br />Allitigatloee Measures: <br />AQ -1 Prior to issuance of any Grading Permit, the City Engineer and the Building Safety <br />Manager shall confirm that the Grading Plan, Building Plans, and specifications <br />stipulate that, in compliance with SCAQIv1D Rule 403, excessive fugitive dust <br />emissions shall be controlled by regular watering or other dust prevention measures, <br />as specified in the SCAQMD's Rules and Regulations. In addition, SCAQIvID Rule <br />402 requires implementation of dust suppression techniques to prevent fugitive dust <br />from creating a nuisance off -site, Implementation of the following measures would <br />reduce short -term fugitive dust impacts on nearby sensitive receptors: <br />All active portions of the construction site shall be watered every three hours <br />during daily construction activities and when dust is observed migrating from the <br />project site to prevent excessive amounts of dust. <br />Statement of Pacts and Findings 17 June 2015 <br />