My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-019 - California Environmental Quality Act
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2016
>
2016-019 - California Environmental Quality Act
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 10:41:28 AM
Creation date
3/22/2016 11:51:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2016-019
Date
3/15/2016
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) Mater Dei High School <br />Parking Structure and School Expansion Project <br />Environmental Impact Report <br />Pave or apply water every three hours during daily construction activities or <br />apply non -toxic soil stabilizers on all unpaved access roads, parking areas, and <br />staging areas. More frequent watering shall occur if dust is observed migrating <br />from the site during site disturbance. <br />Any on -site stockpiles of debris, dirt, or other dusty material shall be enclosed, <br />covered, or watered twice daily, or non-to,-,Ac soil binders shall be applied. <br />+ All grading and excavation operations shall be suspended when wind speeds <br />exceed 25 miles per hour. <br />Disturbed areas shall be replaced with ground cover or paved immediately after <br />construction is completed in the affected area. <br />Track -out devices such as gravel bed track -out aprons (3 inches deep, 25 feet <br />long, 12 feet wide per lane and edged by rock berm or row of stakes) shall be <br />installed to reduce mud /dirt trackout from unpaved truck exit routes. <br />Alternatively a wheel washer shall be used at truck exit routes. <br />+ On -site vehicle speed shall be limited to 15 miles per hour. <br />All material transported off-site shall be either sufficiently watered or securely <br />covered to prevent excessive amounts of dust prior to departing the job site. <br />+ Reroute construction trucks away from congested streets or sensitive receptor <br />areas. <br />AQ -2 All trucks that are to haul excavated or graded material on -site shall comply with <br />State Vehicle Code Section 23114 (Spilling Loarb� on Higbwav�u), with special attention <br />to Sections 23114(b)(F), (e)(4) as amended, regarding the prevention of such material <br />spilling onto public streets and roads. Prior to the issuance of grading permits, the <br />Applicant shall demonstrate to the City Engineer how the project operations subject <br />to that specification during hauling activities shall comply with the provisions set <br />forth in Sections 23114(b)(F), (e)(4). <br />AQ -3 Prior to issuance of any Grading Permit, the City Engineer and the Building Safety <br />Manager shall confirm that the Grading Plan, Building Plans, and specifications <br />stipulate that, in compliance with SCAQMD Rule 403, O, precursor emissions from <br />construction equipment vehicles shall be controlled by maintaining equipment <br />engines in good condition and in proper tune pet manufacturer's specifications, to <br />the satisfaction of the City Engineer. Maintenance records shall be provided to the <br />City by the construction contractor on a monthly basis. The City Inspector shall be <br />responsible for ensuring that contractors comply with this measure during <br />construction. <br />Statement of Pacts and Findings 18 June 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.