Laserfiche WebLink
Mater Dei High School <br />Parldng Structure and School Expansion Project <br />,l' Environmental Impact Report <br />Applicant shall demonstrate to the City Engineer how the project operations subject <br />to that specification during hauling activities shall comply with the provisions set <br />forth in Sections 23114(b)(I), (e)(4). <br />AQ -3 Prior to issuance of any Grading Pennit, the City Engineer and the Building Safety <br />Manager shall confirm that the Grading Plan, Building Plans, and specifications <br />stipulate that, in compliance w th SCAQMD Rule 403, Os precursor emissions from <br />construction equipment vehicles shall be controlled by maintaining equipment <br />engines in good condition and in proper tune per manufacturer's specifications, to <br />the satisfaction of the City Engineer. Maintenance records shall be provided to the <br />City by the construction contractor on a monthly basis. The City Inspector shall be <br />responsible for ensuring that contractors comply with this measure during <br />construction. <br />NOISE <br />The project's potential impacts in regards to noise that can be mitigated or are otherwise less than <br />significant are discussed in Section 5 5, Zi r, of the Draft EIR. Identified impacts include short - <br />term construction noise, construction - related vibration, and short -term cumulative impacts. <br />Short -Term Construction Noise Impacts. Grading and construction w thin the project site <br />would not result in significant temporary noise impacts to nearby noise sensitive receivers. <br />Firming s <br />Changan or alteration have been squired in, or incorporated into, the pr jea, which avoid or substandaly <br />lessen the ezgn fcani environmental offact as idend fed in tha Draft EIR. <br />2. The e f eds idenPiried in the Draft EI13 liana been datermined not to be sign freant. <br />Facts in Support of Findings <br />The potential impacts from short -term construction noise have been mitigated or substantially <br />lessened to a level of less than significant by virtue of the mitigation measure identified in the Draft <br />EIR. <br />Mitigation Measure: <br />N -1 Prior to Grading Permit issuance, the Project Applicant shall demonstrate, to the <br />satisfaction of the City of Santa Ana Planning Division that the project complies <br />with the following: <br />Construction contracts specify that all construction equipment, fixed or mobile, <br />shall be equipped with properly operating and maintained mufflers and other <br />state required noise attenuation devices. <br />Statement of Facts and Findings 22 Julie 2015 <br />