My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
20C - AA - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:29:35 AM
Creation date
4/14/2016 5:05:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i u <br />6 , <br />* Y <br />February 23, 2016 <br />Mindy Ly, P.E. <br />Project Manager <br />City of Santa Ana <br />Public Works Agency <br />20 Civic Center Plaza; P Floor Reception, Ross Annex <br />Santa Ana, CA 92701 <br />Re: Storm Drain Master Plan Phase 2, RFP No.: 16 -02 <br />Dear Ms. Ly <br />Michael Baker International, Inc. (Michael Baker) is pleased to provide this proposal to the City of Santa Ana (City) <br />for the Storm Drain Master Plan Phase 2 project. We have thoroughly examined and are familiar and concur with <br />the services and responsibilities and provisions required in this RFP. Having recently completed the Phase 1 <br />update, the Michael Baker team is capable of effectively and efficiently performing quality work to achieve the <br />City's objectives. Our qualified team will use their familiarity with the project history, experience with Orange <br />County, and expert performance in flood modeling to immediately begin performing the services required for this <br />project in a timely manner. <br />The Michael Baker team's expertise and capability in the fields of storm drain design, hydrology and hydraulics, <br />master plan preparation, storm water quality, low impact development (green infrastructure retrofitting) and <br />grant application coordination offers you a comprehensive team all under one roof. This will ensure project scope <br />components are coordinated seamlessly and innovative solutions are identified and thoroughly vetted while <br />maintaining line -of -sight for available funding opportunities. <br />On behalf of Michael Baker, a corporation that has completed more than 20 drainage master plans in the last <br />decade, including the City of Santa Ana's Phase 1 Master Plan, we will provide the City with alternative <br />infrastructure solutions that meet low impact development goals and will serve as a useful tool for years to come. <br />Respectfully, <br />Michael Baker International, Inc. <br />John McCarthy, PE, CFM <br />Principal -in- Charge <br />Page I t <br />INTERNATIONAL 20C -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.