Laserfiche WebLink
Storm Drain Master Plan <br />IUTGWM <br />As part of our commitment to the water resources <br />field, Michael Baker has a specialized staff of over <br />40 local engineers dedicated to flood control <br />engineering, storm water management and water <br />quality services in California, providing the City of <br />Santa Ana a team with tremendous depth of <br />resources and experience. Supporting these local <br />resources, Michael Baker offers one of the largest enginf <br />design, and construction management firms in the countr <br />professional staff of more than 6,000 employees in 90 oft <br />nationwide. <br />Demonstrated Storm Drain Master Plan Experience <br />We bring to this project the technical capabilities needed <br />develop an effective drainage master plan, along with a t <br />successfully working with the City, the County of Orange, iocai <br />communities, public agencies, and stakeholders to incorporate <br />their concerns and issues into the development of innovative and effective project solutions. This team <br />is proficient at employing state -of- the -art modeling tools, data management, and "green" infrastructure <br />retrofitting for high quality and cost effective surface water storage solutions. <br />I Y <br />I{ L I <br />MiEll BMP Retrofit Experience <br />Michael Baker has developed <br />tools for performing Best <br />Management Practice (BMP) <br />retrofit studies that are ideally <br />suited to help the City comply <br />with current and potential future <br />City of Santa Ana, Storm Drain Master Plan Phase 1 x National Pollutant Discharge <br />City of Redlands, Master Drainage Plan x x Elimination System secure ) <br />requirements to help secure <br />City of Buena Park, Storm Drain Master Plan x funding assistance. Our wide <br />County of Orange - San Diego Creek Master Plan of Drainage x variety of experience includes <br />Rancho Palos Verdes Master Plan of Drainage x siting, designing, and <br />City of Anaheim - Storm Drain Master Plan x implementation of BMPs for <br />Midway City Street and Storm Drain Master Plan and Improvements x water quality treatment. The <br />Forbes Road /Oso Creek Multi -use Trail x x Michael Baker Team has a <br />Heritage Fields & Orange County Great Park Drainage Master Plan x clear understanding of the <br />City of Elk Grove on -call Services x requirements the regulated <br />community faces in developing <br />Storm Water Management Plans (SWMP), fulfilling NPDES Permit obligations, implementing BMP <br />retrofit programs, complying with Total Maximum Daily Loads (TMDLs), and other related storm water <br />activities. Michael Baker has successfully developed and completed numerous stormwater BMP retrofit <br />studies including the County of Orange BMP Retrofit Study, City of Palo Alto Southgate Green Streets <br />project, San Bernardino County Watershed Action Plan, as well as assisting Caltrans with identification <br />of retrofit locations. <br />Page 1 2 <br />INTERNATIONAL <br />20C -16 <br />