My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:31:34 AM
Creation date
4/14/2016 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. IS-6828 <br />Harbor Boulevard Corridor Traffic Signal improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />Item <br />Description <br />City <br />Unit <br />Unit Price <br />Amount <br />43 <br />Furnish and install UPS Cabinet and UPS <br />4 <br />EA <br />$sf <br />$ 10 <br />assembly <br />44 <br />Relocate existing traffic signal controller <br />6 <br />CA <br />$ , 00 <br />assembly to new controller cabinet <br />45 <br />Furnish and Install new CCTV camera <br />10 <br />EA <br />$ 61 WD,' <br /><41 "o <br />system <br />1 <br />46 <br />Remove and salvage existing CCTV camera <br />I <br />EA <br />Or <br />$ <br />47 <br />Furnish and Install new pedestrian push <br />76 <br />EA <br />$ to <br />$ <br />button assembly <br />48 <br />Furnish and Install new pedestrian <br />58 <br />EA <br />$ <br />countdown module <br />I <br />49F <br />Remove existing pull box and Furnish and <br />I <br />EA <br />M <br />Install E Pull pax <br />V_w <br />so <br />Remove existing pull box and Furnish and <br />2 <br />EA <br />7c� <br />Install #5 Pull Box <br />51 <br />Furnish and Instal[ 46E Puil-Box <br />5 <br />EA <br />14, 1377�, <br />52 <br />Furnish and Install 45 Pull•Box <br />3 <br />EA <br />53 <br />Furnish and Install new 3" Conduit <br />1175 <br />I LF <br />S -4 <br />54 <br />Remove existing SIC Cable <br />I 5090 <br />LF <br />$ <br />$ "5 U15, <br />55 <br />Furnish and Install 12 Strand SMFC, Cable <br />785 <br />LF <br />10, <br />56 <br />Furnish and Install 24 Strand SMFO Cable <br />4110 <br />LF <br />$ �'50 <br />1t J <br />$ <br />57 <br />Furnish and Install Splice Enclosure in HE <br />pull box, Fusion splice and terminate all <br />a <br />EA <br />3 <br />fibers erfibarschematic. <br />58 <br />Fusion splice and terminate new fibers in <br />canister fiber schematic <br />2 <br />EA <br />$ OU <br />existing splice per <br />59 <br />Terminate fiber drop cable in fiber patch <br />3 <br />EA <br />$ rt_z <br />panel <br />60 <br />Terminate fiber distribution cable In fiber <br />I <br />EA <br />$ <br />patch panel <br />EIP-4 <br />23A -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.