My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:31:34 AM
Creation date
4/14/2016 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITE' OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15 -6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />29 <br />Remove Video Detection System at Harbor <br />1 <br />$"� <br />{ W <br />$ 1 � ` <br />Blvd and Warner Ave <br />30 <br />Pothole For Utility Not Shawn on plan <br />10 <br />EA <br />$ "/U v <br />$j� <br />TOTAL SANTA ANA BID <br />$ <br />City of warden Grove <br />31 <br />Cabinet Upgrade <br />1 <br />EA <br />$ q1A, <br />$ <br />.......... <br />32 <br />Furnish and Install EVP Unit <br />17 <br />EA <br />$ "' <br />$ 40, 66K-0 <br />33 <br />Furnish and Install EVP Phase Selector <br />8 <br />EA <br />$f W <br />$- <br />34 <br />Furnish and Install EVP Cable <br />2745 <br />LF <br />$w <br />35 <br />Furnish and Install Pedestrian Push - Button <br />50 <br />EA <br />tJ� <br />Assembly <br />[ 1�1b • <br />36 <br />Furnish and Install Pedestrian Countdown <br />10 <br />CA <br />$ <br />$ 4 <br />Module' <br />,5&0' <br />37 <br />Furnish and Install Vldac Detection 5�st2m <br />6 <br />EA <br />P� <br />$� <br />q CI <br />$ i /i <br />(VDS) <br />7 <br />TOTAL GARDEN GROVE BID <br />S <br />City of Costa Mesa <br />38 <br />Remove and salvage existing traffic signal <br />1 <br />EA <br />/ <br />$o� <br />$ / _ <br />(7G(}, <br />cabinet. Remove foundation complete. <br />ptt•e" <br />�%1 `v <br />39 <br />Remove and salvage existing traffic signal <br />$ <br />EA <br />$ 1, 5�T p;p <br />$ �}, boo Lp <br />cabinet <br />44 <br />Remove and salvage existing UPS cabinet <br />4 <br />EA <br />�r� <br />$ . <br />$ <br />and assembly <br />41 <br />Furnish and install Type P cabinet on new <br />1 <br />EA <br />$!f <br />foundation <br />OtSa.� <br />42 <br />Furnish and install Type P cabinet on <br />foundation <br />5 <br />EA <br />$f„ <br />$ `, :° u <br />1 T <br />existing <br />ww <br />RP -3 <br />23A -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.