My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:31:34 AM
Creation date
4/14/2016 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO, 15.6828 <br />Harbor Boulevard Corridor Traffic signal improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />4 <br />5 <br />Furnish and Install UPS Cabinet and UPS <br />assembly Relocate existing traffic signal controller <br />assembly to new controller cabinet <br />I <br />1 <br />EA <br />EA <br />$ sm • 00 <br />$ <br />Vo <br />$ <br />6 <br />Rewire Intersection <br />i <br />LS <br />s <br />00 <br />/00, -- <br />7 <br />Remove existing pull box <br />I <br />EA <br />$ <br />$ i6b, <br />a <br />Furnish and Install No, 6V Pull Box <br />2 <br />EA <br />$ <br />9 <br />Furnish and Install new 2" conduit <br />20 <br />LF <br />$ <br />co- <br />10 <br />Furnish and Install new 3" conduit <br />220 <br />LF <br />$ <br />q,,' q� ,R <br />11 <br />Furnish and Install new 4" conduit <br />40 <br />LF <br />$ <br />0 J'0' 1-13 <br />12 <br />Terminate fiber drop cable In fiber patch <br />I <br />EA <br />$ <br />/1 4, <br />Panel <br />�emblto new controller cabinet <br />I <br />— <br />13 <br />Furnish and Install 010 Trace Wire <br />260 <br />LF <br />$ <br />$ <br />14 <br />�u <br />1 <br />EA <br />$ <br />cabinet to 46E Pull -Box <br />ox <br />_a: <br />1: <br />TOTAL <br />ALTERNATE <br />BID#3 <br />Altemate <br />51.4 ri4 -- W!5on Streit at Harbor Blvd <br />Cabinat Upgradas <br />- Cit 'Y of CoSta <br />Mesa <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Remove and salvage existing traffic signal <br />1 <br />EA <br />$ 600, <br />$ goo <br />cabinet. <br />2 <br />Furnish and Install Type P cabinet on <br />1 <br />EA <br />$ <br />q5o <br />existing foundation <br />—Controller <br />3 <br />Relocate existing traffic signal <br />1 <br />EA <br />$ <br />SP A <br />�emblto new controller cabinet <br />TOTAL <br />ALTERNATE <br />BID#4 <br />$ <br />jQ 00 <br />MW <br />23A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.