My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
04/19/2016
>
23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:31:34 AM
Creation date
4/14/2016 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
4/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15.6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />Z Furnish and Install Type P cabinet on new EA $ s�� ��� � <br />foundation. J <br />Furnish and Install UPS cabinet and UPS t EA $ C $ i LV <br />Assembly i2 <br />4 Relocate existing traffic signal controller 1 EA <br />assembly to new controller cabinet <br />TOTAL ALTERNATE BID #5 $ ('0190 0-0 <br />TOTAL Base Bid plus Alternate 1,2,3,4LIM� <br />plus all Alternate Bid Items. <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25!" limit as stated in Section 3 -2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves <br />the right to Increase or decrease the quantity of this Item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDAT @D DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total contract base bid <br />amount shown above, within eighty (80) working days after the commencement date stated in <br />the Notice to Proceed. <br />If Alternate Bid91rs awarded, five (5) working days will be added to the working days assigned <br />to complete the contract base bid items. <br />If Alternate Bid #2 is awarded, five (5) working days will be added to the working days assigned <br />to complete the contract base bid items. <br />If Alternate Bid #3 is awarded, twenty (20) working days will be added to the working days <br />assigned to complete the contract base bid items. <br />if Alternate Bid #4 is awarded, ten (10) working days will be added to the working days assigned <br />to complete the contract base bid items. <br />BP -7 <br />23A -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.