My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2895
Clerk
>
Ordinances
>
2011 - 2020 (NS-2813 - NS-3000)
>
2016 (NS-2889 - NS-2907)
>
NS-2895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 1:58:40 PM
Creation date
4/20/2016 10:17:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2895
Date
4/5/2016
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The fee will not be applied to the remodel or rehabilitation <br />of existing buildings, <br />Credit will be given for the demolition of any existing <br />structure pursuant to Santa Ana Municipal Code § 8 -44. <br />(ii) Drainage Area Fee: <br />Payment will be due prior to the issuance of a building <br />permit. <br />A 12 -acre credit will be given for previous fees paid for the <br />Property. <br />(iii) Sewer Connection Fee: <br />Payment shall be due prior to issuance of building permits, <br />Credit will be given for fixture units removed due to the <br />demolition of any structure. <br />No fee shall be collected for the rehabilitation or remodel <br />of a building unless there is a net increase in the number of <br />fixture units. <br />The parties also understand that City currently collects a fee on behalf of the Orange County <br />Sanitation District and that such district determines the rules for collection, and for determining <br />the amount, of that fee. <br />City shall not impose any fee on Developer for the construction of street medians, <br />Dedications and Street Improvements <br />(a) Dedication of a 34 -foot wide drainage and utility casement with <br />landscaping as shown on Exhibit 7 attached hereto and incorporated herein by this reference. <br />Developer, at a minimum, shall be responsible for replacement of the paving and improvements <br />within the Pedestrian Plaza as identified on the Site Plan. <br />Prior to the issuance of a certificate of occupancy for any new building on the Property, <br />Developer shall make the dedication described in subsection 7(a), above, and shall complete the <br />improvements listed in subsection 7(b). <br />(b) Parking Structure and Additional Athletic Space to be completed by <br />Developer at Developer's sole cost and expense: <br />(i) Installation of a traffic signal and crosswalk at Bristol Street and <br />St, Andrew Place, plus a dedicated right -tram lane along westbound <br />St, Andrew Place at Bristol Street; <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.