My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILLDAN ENGINEERING-2015
Clerk
>
Contracts / Agreements
>
W
>
WILLDAN ENGINEERING-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 1:12:02 PM
Creation date
4/27/2016 9:48:14 AM
Metadata
Fields
Template:
Contracts
Company Name
WILLDAN ENGINEERING
Contract #
A-2015-168
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
11/9/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHBIT 10-H <br />Sample Cost Proposal <br />EXHIBIT 10-H SAMPLE COST PROPOSAL (EXAMPLE #2) <br />Page I of <br />SPECIFIC RATE OF COMPENSATION (USE FOR ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />Consultant Willdan Engineering Contract No. RFP 14-037 Date January 30, 2015 <br />Fringe Benefit % + Overhead and General Administration % = Combined Indirect Cost Rate (ICR) % <br />51.08% + 109.03% = 160.11% <br />FEE%= 10% <br />�i[efl►1��]:�u/:YY[�7► �Ii1D_YY[i. I►7�i�iY�77lLI_YYCi7�1 <br />Name/Job Title/Classification' <br />Hourly Billing Rates' <br />Effective date of hourly rate <br />Actual or Avg. <br />% or $ <br />Hourly range - <br />Straight OT(1.5x) OT(2x) <br />From To <br />hourly rate' <br />increase <br />for classifications <br />only <br />Peter Miessner/ProjectManager1I <br />$181.69 <br />02/01/2015 <br />01/31/2016 <br />$63.50 <br />$190.77 <br />NA <br />NA <br />02/01/2016 <br />01/31/2017 <br />$66.68 <br />5% <br />Not Applicable <br />$198.40 <br />02/01/2017 <br />01/31/2018 <br />$69.34 <br />4 % <br />Adel M. Freij/Principal Project <br />$182.00 <br />02/01/2015 <br />01/31/2016 <br />$63.61 <br />Manager <br />$191.10 <br />NA <br />NA <br />02/01/2016 <br />01/31/2017 <br />$66.79 <br />5% <br />Not Applicable <br />$198.75 <br />02/01/2017 <br />01/31/2018 <br />$69.46 <br />4 % <br />John Hidalgo/PrincipalProject <br />$15L19 <br />02/01/2015 <br />01/31/2016 <br />$52.84 <br />Manager <br />$158.75 <br />NA <br />NA <br />02/01/2016 <br />01/31/2017 <br />$55.48 <br />5% <br />Not Applicable <br />$165.10 <br />02/01/2017 <br />01/31/2018 <br />$57.70 <br />4 % <br />Herbert L Gluesing, Jr./Director <br />$194.91 <br />02/01/2014 <br />01/31/2016 <br />$68.12 <br />$204.65 <br />NA <br />NA <br />02/01/2016 <br />01/31/2017 <br />$71.53 <br />5% <br />Not Applicable <br />$212.84 <br />1 <br />02/01/2017 <br />01/31/2018 <br />$74.39 <br />4 % <br />1. Names and classifications of consultant (key staff) team members must be listed. Provide separate sheets for prime and all subconsultant firms. <br />2. Billing rate = actual hourly rate x (1+ ICR) r (1+ Fee). Agreed upon billing rates are not adjustable for the term of contract. <br />3. For named employees enter the actual hourly rate. For classifications only, enter the average hourly rate for that classification. <br />Note: <br />• Denote all employees subject to prevailing wage with an asterisks (*) <br />• For "Other Direct Cost' listing, see page 2 of this Exhibit <br />Page 1 <br />LPP 13-01 June 20, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.