My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
20C - AA - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:18:21 PM
Creation date
4/28/2016 2:23:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />APRIL 19, 2016 <br />TITLE: <br />AGREEMENT WITH MICHAEL BAKER <br />INTERNATIONAL FOR PROFESSIONAL <br />ENGINEERING SERVICES <br />(PROJECT 16-6608) <br />(STRATEGIC PLAN NO. 6, 1F) <br />CITY MAN5k6ER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 18` Reading <br />❑ Ordinance on 2n' Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO (DI <br />6,,001� <br />FILE NUMBER <br />1. Authorize the City Manager and Clerk of the Council to execute an agreement with Michael <br />Baker International to provide professional engineering services for a one-year term beginning <br />April-20, 201-6', through with provision for two one-year term extensions <br />exercisable by the City Manager and the City Attorney, in an amount not to exceed $236,956 <br />over the life of the agreement, subject to nonsubstantive changes approved by the City <br />Manager and City Attorney. <br />* May 4, 2016 —May 4, 2017 <br />2. Approve an appropriation adjustment recognizing $150,000 in current year funds received <br />from fees collected and interest earned in the Local Drainage Area Fund 221, 222, and 223 <br />revenue accounts, and appropriating the same amount into the respective Local Drainage <br />Area Fund 221, 222, and 223 expenditure accounts. <br />DISCUSSION <br />An update to the Storm Drain Master Plan was completed in 2015. The updated master plan <br />recommends various below -grade improvements, such as the installation of new storm drain <br />pipes and upsizing existing storm drain pipes. Those recommended improvements provide for <br />the ultimate build -out of storm drains, offering citywide drainage protection. The cost for total <br />build -out is $626 million, which is not being considered at this time. <br />Staff is recommending a supplementary study which focuses on alleviating flooding in localized <br />watersheds. The additional analysis would identify alternative infrastructure consisting of low <br />impact development alternatives to costly storm drain improvements. It is anticipated that such a <br />study would provide a menu of improvements, technology, and devices which could be applied <br />citywide at a reduced cost. Staff would then pursue grant opportunities for these alternative <br />improvements to supplement the existing below -grade storm drain system where feasible. <br />20C-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.