My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25N - AGMT - TESTING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/03/2016
>
25N - AGMT - TESTING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2016 3:23:22 PM
Creation date
4/28/2016 3:11:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25N
Date
5/3/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work prior to submitting a response to this Request for Proposal (RFP). <br />• The Consultant shall perform work to produce a high quality, professional and complete work <br />product. <br />• .Consultan't must have experience with State and Federal funded projects. All work shall be <br />performed in conformance with all applicable regulations, policies, procedures and standards. <br />• The Consultant shaft carry out the instructions received from the City and shalt cooperate with the <br />City and other agencies. <br />• The Consultant has total responsibility for the accuracy and completeness of the work produced. <br />The work will be reviewed by the City for conformity with the requirements of the Agreement. <br />Reviews by the City may NOT include a detailed review for the accursoy of items submitted, The <br />responsibility for accuracy and completeness of such items remains solely that of the Consultant. <br />• The Consultant shall be responsible for coordination and supervision of all work performed by its <br />Rib -consultants. The Consultant shall review all work performed by its sub -consultants and the <br />responsibility for accuracy and completeness of work performed remains solely that of Consultant. <br />• The Consultant shall have a Quality Control Plan (QCP) in effect during the entire time work is <br />being performed under the Agreement, The QCP shall establish a process whereby work products <br />are independently checked, corrected and back checked. All projects related correspondences and <br />documents should be maintained and bound in appropriate project files. Additionally, all electronic <br />files shall conform to the City's 'file naming system. The consultant shall submit their QCP as part <br />of the response to this RFP. <br />• The Consultant shall diligently work on each assignment and complete each task in accordance with <br />the schedule and accommodate the City's needs. <br />• The Consultant's work will be subject to inspection and audit by City, County, State and Federal <br />representatives. <br />• Project files including copies of all correspondences, reports, documents, and electronic files shall be <br />submitted to the City when requested and electronically updated monthly. <br />• All work, including reports, analysis, data, and intellectual properties developed during the life of the <br />Agreement shall become the properties of the City. <br />• The Consultant will receive written notification of tho award of the contract. Upon on such <br />notification, the Consultant will proceed with the services required by the Agreement. <br />• This agreement is subject to compliance, monitoring and enforcement by the State of California <br />Department of industrial Relations. Consultants are required to inform themselves filly of the <br />conditions relating to labor under which the work will be performed. In accordance with the <br />California State Labor Code, prevailing wage rates apply per the following link. <br />httn:i/wsw'w lir ca govinublic-uvorks/nublicnvorlcs.htrnl <br />City of Santa Ana RFP 15-055 <br />Page Al -5 <br />25N-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.