Laserfiche WebLink
COST ANALYSIS <br />PROJECT NO. 15 -6606: 3RD STREET TRAFFIC CALMING PROJECT <br />Construction Contract <br />$ 239,480.00 <br />Contract Administration <br />$ 17,715.00 <br />Inspection and Testing <br />$ 18,207.00 <br />Survey <br />$ 0.00 <br />Contingencies <br />$ 23,948.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$299,350.00 <br />EXHIBIT 4 <br />23A -55 <br />