Laserfiche WebLink
Project Name: Kana Project # 4812 - OCTA Tustin Metrolink Parking Structure <br />Location: Tustin, CA (2975 Edinger Ave./ TG 860 D -1) <br />Description: Night work to relocate sewer and storm drainage pipeline work so as not to <br />disturb adjacent businesses, as well as water and f "ireline systems to make <br />way for a new parking structure for the Orange Co mty Transit Authority. <br />Highlights: Pipeline work generally consisted of relocating sewer, and storm <br />drainage pipeline systems, in addition to a new water and fireline system in <br />order to build a new parking structure adjacent to existing set of office <br />buildings for OCTA. Specifically, 4" -24" storm drain pipelines with catch <br />basins, storm drain manholes, junction structure and a storm water filter <br />vault; Sewer pipes ranging from 4" to 8" with corresponding manholes, <br />cleanouts and a sewer bypass; Water pipelines between 2 " -8" with related <br />valves, hydrants, backflows, detector check, fire department connection <br />(FDC) and infrastructures. <br />Total Man- hours: 2,806 <br />Owner: City of Tustin, 200 Centennial Way, Tustin, CA 92780 <br />Project Manager: Scott Lesard, Sr. PM, Bomel Construction (714) 921 -1660 <br />Contract Amount: $ 531,996.00 <br />Start (Date: 11/02/10 <br />Date Of Completion: 10/6/2011 <br />Kana Pipeline Public Works Resume [Confidential] /Page 3 of 25 as of 1/2015. <br />23B -34 <br />