My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Kana Project # 4812 - OCTA Tustin Metrolink Parking Structure <br />Location: Tustin, CA (2975 Edinger Ave./ TG 860 D -1) <br />Description: Night work to relocate sewer and storm drainage pipeline work so as not to <br />disturb adjacent businesses, as well as water and f "ireline systems to make <br />way for a new parking structure for the Orange Co mty Transit Authority. <br />Highlights: Pipeline work generally consisted of relocating sewer, and storm <br />drainage pipeline systems, in addition to a new water and fireline system in <br />order to build a new parking structure adjacent to existing set of office <br />buildings for OCTA. Specifically, 4" -24" storm drain pipelines with catch <br />basins, storm drain manholes, junction structure and a storm water filter <br />vault; Sewer pipes ranging from 4" to 8" with corresponding manholes, <br />cleanouts and a sewer bypass; Water pipelines between 2 " -8" with related <br />valves, hydrants, backflows, detector check, fire department connection <br />(FDC) and infrastructures. <br />Total Man- hours: 2,806 <br />Owner: City of Tustin, 200 Centennial Way, Tustin, CA 92780 <br />Project Manager: Scott Lesard, Sr. PM, Bomel Construction (714) 921 -1660 <br />Contract Amount: $ 531,996.00 <br />Start (Date: 11/02/10 <br />Date Of Completion: 10/6/2011 <br />Kana Pipeline Public Works Resume [Confidential] /Page 3 of 25 as of 1/2015. <br />23B -34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.