My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proiect Name: Kana Project# 4301 - Crescent Drive Underground Garage — Beverly Hills <br />Location: 455 N. Crescent Drive, Santa Monica Boulevard <br />Description: 1,400' of 18" VCP Sewer Main, 1,000' of 8" DIP Water main. <br />Additional detail: Kana installed sewer and water pipeline systems in busy streets to sustain a <br />future underground parking garage located next to Beverly Hills City Hall, This project consisted <br />of abandoning and removing existing sewer manholes, constricting 8ea. 48" sewer manholes, saw <br />cutting and zipping trench lines, installing a 18" VCP clay pipe sewer main in the street right of <br />way, rerouting sewer pipelines, sewer video, base paving, capping, slurry sealing streets, restriping <br />and traffic loops; approximately 1,000 LF 8" and 6" ductile iron (DIP CL 52) water pipeline main <br />and lateral pipe, respectively, for post office, fire hydrants , removed and replaced sidewalk; <br />Kana's Subsurface Utility Engineering Department conducted approximately 70 potholes to verify <br />location of existing utilities, and necessary traffic control to maintain driver, pedestrian and <br />construction work zone safety. <br />Total Man - hours: 5,201 <br />Owner: <br />City of Beverly Hills <br />Proiect Manaeer: <br />Jason Lin (562) 903 -2277 <br />Contract Amount: <br />$ 1,213,564.00 <br />Start Date: <br />11/02/2009 <br />Date Of Completion: <br />07/01/2010 <br />]Cana Pipeline Public Works Resume [Confidential] /Page 4 of 25 as of 1/2015, <br />23B -35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.