Laserfiche WebLink
A�:... <br />At=7Kana Pipeline, Inc. <br />Proiect Name: Kana Project 4 5212 — Concrete Street Water Pipeline Improvements Santa <br />Ana <br />Location: Various streets throughout Santa Ana, CA <br />Description: Karla Pipeline installed several thousand feet of water pipeline main and <br />related infrastructures along Concrete Street in various locations.Over 6,000 <br />LF 8" and 12" PVC C900 water main pipeline, 1" & 2" water services, <br />resilient wedge gate valves, a fire line main and lateral with new fire hydrant <br />assemblies, and hot taps; traffic control and pavement markings; cold mill <br />and asphalt pavement overlays /grind and cap. <br />Total Man - hours: 5,792 <br />Owner: City of Santa Ana <br />Project Manager: Edward Torres, Project Manager of Construction (714) 647 — 5018 / <br />etorres@santa- ana•org <br />Contract Amount: $ 723,755.00 <br />Start Date: 07/11/2011 <br />Date Of Completion: 3/23/2012 <br />Kana Pipeline Public Works Resume [Confidential] /Page 12 of 25 as of 1/2015. <br />23B -43 <br />