My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o � :i'i. Pipeline, Inc <br />Pro iect Name: Kana Project # 4337 — Sewer Rehabilitation, Cypress, CA <br />Location: Cypress, CA (Katella and Holder) <br />Description: Installed approximately 8" VCP 419LF, and 12" VCP 1,332 LF pipeline <br />installation, including street resurfacing, curb and gutter reconstruction, <br />mobilization, traffic control, 14 house sewer lateral reconnects, removal and <br />disposal of conflicting existing sewer lines, 1,751 LF, flush ex sewer and <br />install 8" PVC Lining for 255 LF, Install Sancon 200 coating inside <br />manholes, 1,000 - gallon ground water treatment for groundwater dewatering <br />purposes. <br />Total Man-hours: 3,506 <br />Owner: City of Cypress, 5275 Orange St., Cypress, CA 90630 <br />Project .Manager: Cameron Dadbeh General Manager (714)229 -6740 <br />Contract Amount: $ 700,855.00 <br />Start Date: 12/14/2009 <br />Date Of Completion: 4/30/2010 <br />Kana Pipeline Public Works Resume [Confidential] /Page 13 of 25 as of 1/2015. <br />23B -44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.