Laserfiche WebLink
o � :i'i. Pipeline, Inc <br />Pro iect Name: Kana Project # 4337 — Sewer Rehabilitation, Cypress, CA <br />Location: Cypress, CA (Katella and Holder) <br />Description: Installed approximately 8" VCP 419LF, and 12" VCP 1,332 LF pipeline <br />installation, including street resurfacing, curb and gutter reconstruction, <br />mobilization, traffic control, 14 house sewer lateral reconnects, removal and <br />disposal of conflicting existing sewer lines, 1,751 LF, flush ex sewer and <br />install 8" PVC Lining for 255 LF, Install Sancon 200 coating inside <br />manholes, 1,000 - gallon ground water treatment for groundwater dewatering <br />purposes. <br />Total Man-hours: 3,506 <br />Owner: City of Cypress, 5275 Orange St., Cypress, CA 90630 <br />Project .Manager: Cameron Dadbeh General Manager (714)229 -6740 <br />Contract Amount: $ 700,855.00 <br />Start Date: 12/14/2009 <br />Date Of Completion: 4/30/2010 <br />Kana Pipeline Public Works Resume [Confidential] /Page 13 of 25 as of 1/2015. <br />23B -44 <br />