Laserfiche WebLink
Pipeline, <br />Pro ect Name: Dana Project # 6426 — Sunset Beach Water Phase 2 <br />Location: Various Streets near the beach; near homes, <br />Description: New Pipeline for the Sunset Beach Water Main and Pavement Replacement <br />Construction Project CC -1429 <br />Highlights: <br />Bids were opened publicly in mid October of 2013 where Kana Pipeline was officially awarded the <br />project after providing the lowest responsive and responsible bid, placing 3rd lowest behind a non- <br />responsive bidder and another bidder who withdrew their bid. <br />This pipeline work is part of the City's water main replacement program, where it was identified <br />that 1,200 LF of old, existing water mains in eight different alleys throughout Sunset Beach were <br />required to be abandoned or replaced; from Warner Avenue to Anderson Street. <br />This project involves replacing existing 34" asbestos cement pipelines installed in the 1950's, with <br />new 6 -inch PVC (plastic) pipelines. The project will also include reconstruction of alleys after <br />waterline is installed. It was determined that combining both the water improvements with the <br />street improvements would avoid a second, separate construction impact to local residents and <br />businesses for future pavement rehabilitation, <br />Fire hydrants will also be installed along Pacific Coast Highway which will allow better <br />accessibility to the Fire Department, <br />Total Man - hours: 4,956 total hours; approx 200 working days to complete. <br />Owner: City of Huntington Beach, 2000 Main Street, HB, CA 92648 <br />Project Mananer: Lily Hernandez, PE, (714) 374 -5386, lernandez cr,surfcit -leg, <br />or Michael Helma, CM (562) 342 -7027, mahelma(ktransystems.com <br />Contract Amount: Original $ 1,647,715.00 <br />Start Date: 12/6/2013 <br />Date Of Completion: 7/2014 <br />Kana Pipeline Public Works Resume [Confidential] /Page 16 of 25 as of 1/2015. <br />23B -47 <br />