My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pipeline, <br />Pro ect Name: Dana Project # 6426 — Sunset Beach Water Phase 2 <br />Location: Various Streets near the beach; near homes, <br />Description: New Pipeline for the Sunset Beach Water Main and Pavement Replacement <br />Construction Project CC -1429 <br />Highlights: <br />Bids were opened publicly in mid October of 2013 where Kana Pipeline was officially awarded the <br />project after providing the lowest responsive and responsible bid, placing 3rd lowest behind a non- <br />responsive bidder and another bidder who withdrew their bid. <br />This pipeline work is part of the City's water main replacement program, where it was identified <br />that 1,200 LF of old, existing water mains in eight different alleys throughout Sunset Beach were <br />required to be abandoned or replaced; from Warner Avenue to Anderson Street. <br />This project involves replacing existing 34" asbestos cement pipelines installed in the 1950's, with <br />new 6 -inch PVC (plastic) pipelines. The project will also include reconstruction of alleys after <br />waterline is installed. It was determined that combining both the water improvements with the <br />street improvements would avoid a second, separate construction impact to local residents and <br />businesses for future pavement rehabilitation, <br />Fire hydrants will also be installed along Pacific Coast Highway which will allow better <br />accessibility to the Fire Department, <br />Total Man - hours: 4,956 total hours; approx 200 working days to complete. <br />Owner: City of Huntington Beach, 2000 Main Street, HB, CA 92648 <br />Project Mananer: Lily Hernandez, PE, (714) 374 -5386, lernandez cr,surfcit -leg, <br />or Michael Helma, CM (562) 342 -7027, mahelma(ktransystems.com <br />Contract Amount: Original $ 1,647,715.00 <br />Start Date: 12/6/2013 <br />Date Of Completion: 7/2014 <br />Kana Pipeline Public Works Resume [Confidential] /Page 16 of 25 as of 1/2015. <br />23B -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.