My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location: Huntington Beach, CA, CA (All between I hh 12`b, 14' 15o1i 16Th 27th <br />23`d, and 24d' streets, from N Pacific Ave., to Pacific Coast Highway (PCH); <br />ref: TG 826 J7) <br />Description: Furnish and install 907 LF 6" and 240 LF 1.2" DR -14 PVC AWWA C900, a <br />12" bore of steel casing under CalTrans alley approach, 1" and 2" water <br />services and % and I" water meter assemblies with meter box; removing <br />existing meter box; chlorination and testing of all new water main and <br />appurtenances, Asbestos Cement (AC) pipe legal disposal; 4" blow off <br />assemblies, remodel 4 sewer house connection laterals conflicting with <br />proposed waterline, remove and salvage exist FH including removing buy, <br />valve and appurtenances; conducted preconstruction survey of existing <br />home and street as required by contract does., temp water services and blow <br />off, 4" temp hot tap to existing 6" AC Pipeline valve; all related traffic <br />control, Also includes mobilization, demobilization and cleanup as well as <br />alley rehabilitation for all sites. <br />Total Man - hours: 4,956 total hours; approx 200 working days to complete. <br />Owner: City of Huntington Beach, 2000 Main Street, HB, CA 92648 <br />Project Manager: Duane D. Wenthworth, CM, (714) 536 -5517; dwentworth(Asurfeity- <br />hb,org <br />(Lili Hemadez 714 - 374 -5386 <br />Contract # 1412 Amount: Contract $ 1,324,306.24 <br />Start Date: 11/13/12 <br />Date Of Completion: 5/18/2013 <br />�e <br />Kana Pipeline Public Works Resume [Confidential] /Page 15 of 25 as of 1/2015. <br />23B -46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.