My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proiect Name: Kana Project # 6120 -- Water Main System Replacement 2012 -2013/ PO <br />P0014 <br />Location: Fullerton, CA, (Jobsite Located at W. Valencia Dr., between Basque Ave. <br />and Richman Ave.); USA's on Rolling Hills Dr. at E. Rosalia Dr and Maple Ave. <br />Description: Furnish and install 3,340 LF of 8" PVC CL150, and 2,680 LF of 12" and <br />2,750 of 16" water pipeline main; 4: and 8" meter connections, 8" and 12" <br />gate valves, hot taps, fire hydrant removals and installations, I" air vac <br />assemblies, 4" blow off assemblies, residential driveway reconstruction, <br />curb access ramp and modified curb access ramp, cross batter /spandrel, <br />local depression, asphalt concrete and aggregate base, adjustment to sewer <br />manholes to grade and adjustment of water valves to grade; Includes <br />mobilization and demobilization, NPDES compliance, clear and grub, traffic <br />control, signing, striping and loops. <br />Total. Man- hours: 7,534.00 man-hours <br />Owner: City of Fullerton, CA <br />303 West Commonwealth Avenue Fullerton, CA 92832 <br />Proiect Manager: Vince Oseguera, CM, (714) 738 -6851, VinceraOQa ci.fullerton.ca.us <br />Contract Amount: $ 2,286,000.00 <br />Start Date: 2/28/13 <br />Date Of Completion: 10/9/2013 <br />Kana Pipeline Public Works Resume [Confidential] /Page 18 of 25 as of 1/2015. <br />23B -49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.