My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - WARNER WATER AND SEWER IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
05/17/2016
>
23B - PROJ - WARNER WATER AND SEWER IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:36:15 AM
Creation date
5/13/2016 8:51:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
5/17/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location: Garden Grove, CA (Trask Ave., / Lily Street) <br />Description: Furnish and install approx 3,500 LF of PVC C900 CL200 in 4 ", 6 ", 8 ", and <br />12" sizes; install corresponding 4 -12" gate valves, connections to main, <br />abandonments in place; 50ea. 1" water services, 4" water service, removal <br />and installation of 7 ea. Fire hydrants, sheeting, shoring, bracing, traffic loop <br />detectors, slurry seal over asphalt including temp stripingand all related <br />traffic control. <br />Total Man- hours: Budgeted Man -hours 2,430 <br />Owner: City of Garden Grove <br />11222 Acacia Parkway, Garden Grove, CA 92840 <br />Project Manager: Rebecca Li, Assoc. Engineer /PM (714) 741 -5562, <br />rebeccalgei.garden- grove.ca.us <br />Contract Amount: $ 825,000.00 <br />Start Date: 5/28/13 <br />Date Of Completion: 8/30/13 <br />Kana Pipeline Public Works Resume [Confidential] /Page 20 of 25 as of 1/2015. <br />23B -50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.