Laserfiche WebLink
Location: Garden Grove, CA (Trask Ave., / Lily Street) <br />Description: Furnish and install approx 3,500 LF of PVC C900 CL200 in 4 ", 6 ", 8 ", and <br />12" sizes; install corresponding 4 -12" gate valves, connections to main, <br />abandonments in place; 50ea. 1" water services, 4" water service, removal <br />and installation of 7 ea. Fire hydrants, sheeting, shoring, bracing, traffic loop <br />detectors, slurry seal over asphalt including temp stripingand all related <br />traffic control. <br />Total Man- hours: Budgeted Man -hours 2,430 <br />Owner: City of Garden Grove <br />11222 Acacia Parkway, Garden Grove, CA 92840 <br />Project Manager: Rebecca Li, Assoc. Engineer /PM (714) 741 -5562, <br />rebeccalgei.garden- grove.ca.us <br />Contract Amount: $ 825,000.00 <br />Start Date: 5/28/13 <br />Date Of Completion: 8/30/13 <br />Kana Pipeline Public Works Resume [Confidential] /Page 20 of 25 as of 1/2015. <br />23B -50 <br />