Laserfiche WebLink
Yield Line <br />74 <br />$5 <br />$370 <br />6" Line Striping <br />222 <br />$1 <br />$222 <br />Intersection Enhancements (3) - Median <br />( *includes materials and labor) <br />Unclassified Excavation <br />140 <br />$120 <br />$16,800 <br />AC Pavement <br />5 <br />$162 <br />$810 <br />Construct Concrete Curb <br />96 <br />$25 <br />$2,400 <br />Construct Curb Ramp <br />430 <br />$14 <br />$6,020 <br />Median Island Striping with RPM <br />78 <br />$1 <br />$78 <br />Delineator <br />6 <br />$15 <br />$90 <br />Continental Crosswalk Striping <br />3 <br />$150 <br />$450 <br />Landscaping <br />50 <br />$6 <br />$300 <br />Irrigation <br />50 <br />$12 <br />$600 <br />Intersection Enhancement - RREB (cost <br />includes materials and labor) <br />Rectangular Rapid Plashing Beacon Hardware <br />4 <br />$4,500 <br />$18,000 <br />Unclassified Excavation <br />52 <br />$120 <br />$6,240 <br />Sign Assembly Ted Crossing" <br />4 <br />$300 <br />$1,200 <br />Install 2" PVC Conduit <br />80 <br />$50 <br />$4,000 <br />Construct Concrete Curb <br />40 <br />$25 <br />$1,000 <br />Construct Concrete Sidewalk <br />28 <br />$10 <br />$280 <br />"Except Bicycles" Signage <br />4 <br />$100 <br />$400 <br />Sign and Post "Yield" <br />6 <br />$350 <br />$2,100 <br />6" line striping <br />250 <br />$1 <br />$250 <br />Walking Path <br />Walking Path Signage (in- ground tile markers) <br />50 <br />$100 <br />$5,000 <br />Page 5 of 6 <br />C:\Users\b_ong\Dropbox (CAPOC) \OC PICH \Year 2 - Individual Budget & Sow as Approved \City of Santa Ana - Year 2 SoW & Budget Revised <br />2- 5- 2016.docx <br />