My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENTERPRISE AUTOMATION INC.-2016
Clerk
>
Contracts / Agreements
>
E
>
ENTERPRISE AUTOMATION INC.-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:11:11 PM
Creation date
5/31/2016 11:21:38 AM
Metadata
Fields
Template:
Contracts
Company Name
ENTERPRISE AUTOMATION INC.
Contract #
A-2016-011
Agency
PUBLIC WORKS
Council Approval Date
1/19/2016
Expiration Date
1/31/2019
Insurance Exp Date
11/13/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NTEI RI <br />AUTOMATIO <br />Nothing Leaves Enterprise Untested <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tei 949-769-6000 Fax 949-769-6005 <br />urnlnt@aratul'.com <br />This scope document is in response to the City of Santa Ana's RFP 15-015. The goals <br />and scope described in subsequent chapters have been derived from a variety of <br />different sources, namely: <br />1. The scope of work described in RFP 15-105 <br />2. Enterprise Automation's previous experience working with the City's water <br />team <br />3. Enterprise Automation's application of industry best practices as they apply to <br />the Walnut Pump station upgrade <br />This scope of work expands on the requirements of RFP 15-015, describing the <br />specific activities and work flow that Enterprise Automation will use to perform the <br />project, and clarifies a number of ambiguities in the RFP documents. <br />Any additional work not requested in the RFP scope that EA believes is necessary and <br />has been included will be noted. <br />Any exceptions or clarifications to the RFP scope will be noted. <br />2 Project Gauls <br />The primary project goals are to: <br />1. Act as the owners' Engineer for the automation related elements of the Walnut <br />Pump Station Upgrade as defined by the RFP <br />2. Develop recommendations for City consideration for the Walnut Pump Station <br />Upgrade, both control equipment and operational related <br />3. Develop standards for the use by the Walnut Pump Station Upgrade PCS <br />Integrator and all future City automation upgrades <br />4. Ensure that the Walnut Pump Station Upgrade PCS Integrator is held <br />accountable to: <br />a. The control narrative developed for the facility <br />b. The standards developed for the PLC and HMI <br />c. The FAT protocols developed for the facility <br />d. The SAT protocols developed for the facility <br />5. Ensure that the finished control system at the Walnut Pump Station performs <br />as required by the City, complete with as -built documentation <br />CRY _ rtr_ <br />,tiatornmr; r II of Santa Anm rr^,Uve Cjate 19rOh+-OI5 � <br />FLe,ll£slon 1,00 Patau Numbei ] of 11 i <br />Runr rru EA 155&A085 SCOP: Walnut pwrip ^anon 100 ___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.