My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 5:13:50 PM
Creation date
5/31/2016 4:25:36 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Contract #
A-2016-043
Agency
PUBLIC WORKS
Council Approval Date
3/15/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />• Broadway /Santa Ana Boulevard <br />• Pedestrian Signal /Santa Ana Boulevard <br />• Ross Street /Santa Ana Boulevard <br />The AUTHORITY shall replace, modify, or relocate any traffic signal mast arms, signal <br />cabinets, or signal poles in conflict with the streetcar infrastructure following CITY standards as defined <br />by Exhibit B, Section 6.1.1. Any new poles, cabinets, or mast arms shall match the existing equipment <br />unless agreed to mutually otherwise. Traffic signal equipment upgrades or replacements not required <br />for the Project shall be considered a Betterment. <br />The traffic signal system will provide the OC Streetcar traffic signal priority through peer to peer <br />communications optimizing the priority to the streetcar vehicle while minimizing the impact to vehicular <br />and pedestrian traffic. The amount of green time extension for the streetcar approaching an <br />intersection shall not exceed twenty (20) seconds to allow the streetcar to progress through the <br />intersection. The amount of red time reduction for the streetcar, if stopped at an intersection, shall not <br />be more than twenty (20) seconds to allow the streetcar to progress through the intersection. The <br />green time extension and red time reduction will not be employed at traffic signals where the OC <br />Streetcar crosses Main Street, Broadway, and Bristol Street. <br />The AUTHORITY will be responsible for providing timing plans to the CITY for opening day <br />and design year traffic conditions for all traffic signals affected by streetcar operations. <br />Salvageable signals, poles, and equipment will be removed and turned over to the CITY as <br />requested and implemented in the Plans and Specifications. <br />5.3.4 Traffic Management Plan <br />During design, the AUTHORITY shall prepare a Traffic Management Plan (TMP) for the CITY's <br />review and approval that addresses, to the extent appropriate, construction- related impacts to the <br />CITY's existing street traffic, The TMP will include normal traffic handling requirements during <br />construction of the Project, including staging, lane closures, detours, signage, Intelligent <br />Exhibit B <br />Page 6 <br />L:\Camm\CLERICAL1WORDPROC\AGREE\AG53583_corrected 2016.04.27A= <br />
The URL can be used to link to this page
Your browser does not support the video tag.