My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 5:13:50 PM
Creation date
5/31/2016 4:25:36 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Contract #
A-2016-043
Agency
PUBLIC WORKS
Council Approval Date
3/15/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -5 -3583 <br />EXHIBIT B <br />Existing CITY owned irrigation systems that may be impacted by the Project will be tested prior <br />to construction to verify operational fitness. Systems found to be non - operational shall have heads, <br />valves, and controllers relocated and left in a connection -ready status. <br />6.6 LIGHTING <br />New Project lighting shall be LED lamps. <br />6.6.1 Public Way Lighting <br />There is no new street lighting included in this Project unless mutually agreed otherwise. <br />Lighting will be added to stops as necessary to meet pedestrian lighting standards. The AUTHORITY <br />is not required to upgrade existing lighting if not impacted by the Project. <br />-• <br />The AUTHORITY may install operational lighting in the PE ROW if necessary for operations. <br />Pedestrian level lighting in the PE ROW is not included in the Project other than at stop locations. <br />6.6.3 Maintenance and Storage Facility (MSF) Lighting <br />The AUTHORITY shall implement lighting at the MSF facility in a manner consistent with the <br />approved use and as necessary to ensure the safe and secure operation of the facility. <br />6.7 UTILITIES <br />6.7.1 CITY Utilities <br />CITY utilities include, but are not limited to, the CITY's water distribution system, storm drain <br />system, sanitary sewer system, traffic signal conduits, and the street lighting system. The <br />AUTHORITY's intent is to implement the Project with the least utility impacts possible. Any existing <br />utility in direct conflict with a Project element shall be relocated. Additionally, the AUTHORITY shall <br />apply the following criteria to utilities as applicable: <br />• An existing utility may remain under the trackway, longitudinal and perpendicular, if the <br />material, type, condition, and load capacity of the utility is sufficient. The AUTHORITY shall <br />provide the CITY with an analysis report. Parties to agree on sufficiency. <br />Exhibit B <br />Page 8 <br />L: lCammt CLERiCALiwORDPROCIAGREE\AG53583 _corrected 20M04.27.dou <br />
The URL can be used to link to this page
Your browser does not support the video tag.