My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 5:13:50 PM
Creation date
5/31/2016 4:25:36 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Contract #
A-2016-043
Agency
PUBLIC WORKS
Council Approval Date
3/15/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -5 -3583 <br />EXHIBIT B <br />Shelter— The stop shelters are intended to provide limited protection from rain or sun. The <br />shelters are not intended to be fully enclosed. Shelter specifics shall be developed during the <br />development of Project design criteria. The shelters shall utilize furnishings that are readily <br />available. Custom furnishings shall not be used. <br />Seating /Leaning Rail — The shelters shall have limited seating and /or leaning rail areas. No <br />other seating areas will be provided. <br />Ticket Vending Machines — At the AUTHORITY's discretion, each stop may have a ticket <br />vending machine. <br />Pavement Surface — The pavement surface at stops shall be surfaced to match the adjacent <br />sidewalk material for side - running stops and non - colored concrete on center platforms unless <br />mutually agreed otherwise. A tactile warning strip meeting federal requirements will be <br />provided on the track side of all stops. <br />5.9 TRACTION ELECTRIFICATION SYSTEM <br />The Traction Electrification System is comprised of two categories including Traction Power <br />Substations (TPSS) and the Overhead Contact System (OCS). <br />5.9.1 Traction Power Substations <br />There are a total of five (5) TPSS planned for this Project. Substations shall be spaced as <br />necessary for the OC Streetcar to operate at the frequency desired. Substation locations have been <br />preliminarily identified. The CITY shall cooperate with AUTHORITY on locations for TPSS use <br />identified by the AUTHORITY. <br />The Parties agree that the TPSS may be prefabricated units. Depending on the specific <br />location of the TPSS, aesthetic treatments will be applied to reasonably blend the TPSS into its <br />surroundings. Aesthetic treatments may include but not be limited to walls, structures, fencing, paint <br />treatments, siding, or partial screening. Treatments will be provided for in the Station and Urban <br />Design effort in collaboration with the CITY. <br />Exhibit B <br />Page 11 <br />L:\Camm\CLERICAL\WORDPROC\AGREE\AG53583—corrected 2016.04.27.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.