My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 5:13:50 PM
Creation date
5/31/2016 4:25:36 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-5-3586)
Contract #
A-2016-043
Agency
PUBLIC WORKS
Council Approval Date
3/15/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -5 -3583 <br />EXHIBIT B <br />6.1.4 Packaging <br />The Plans and Specifications prepared by the AUTHORITY shall be comprehensive and <br />represent the complete design of the Project. All design plans shall be on a uniform border, numbered <br />sequentially, and segregated by discipline as deemed appropriate by the AUTHORITY. The design <br />plans and specifications, at the Ready to Bid stage, shall have a signature sheet for both AUTHORITY <br />approval and CITY concurrence. CITY or AUTHORITY signature on individual sheets or specifications <br />is not required. <br />6.1.5 Design Reviews <br />The Plans and Specification design package(s) will entail a formal review package including <br />30 percent, 60 percent, 90 percent, and Ready to Bid. Each shall be scheduled in advance with at <br />least a three -week notice provided for each submittal. The total review time shall be thirty (30) days <br />for each formal review package submittal. The thirty (30) day period begins when the City receives <br />the submittals. If multiple formal review packages are prepared the separate packages will not be <br />concurrently reviewed. In situations where the AUTHORITY intends to submit review packages <br />outside of the formal review packages, the CITY and the AUTHORITY will determine the review times <br />on a case by case basis. The AUTHORITY shall provide the number of copies of the Plans and <br />Specifications for review as requested by the CITY. The CITY shall provide written comments on <br />hard -copy prints, a -file comments, or tabular comments with clear reference to where the comment <br />applies in the review set. Comments must be clear, concise, and legible. Prior to submission to the <br />AUTHORITY, the CITY shall resolve any conflicting comments. <br />The MSF and TPSS site plan design packages shall be reviewed following the CITY's Site <br />Plan Review process and shall be no more than a sixty (60)- -day review. The MSF and TPSS <br />construction document packages shall be reviewed following the CITY's building permit review <br />process and shall be no more than a sixty (60) day review. The sixty (60) day period begins when the <br />Exhibit B <br />Page 14 <br />L:\Camm\ CLERICAL\WORDPROC\AGREE\AG53583—corrected 2016.04.27.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.