My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - ROADWAY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
23A - PROJ - ROADWAY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:44:25 AM
Creation date
6/16/2016 3:23:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/21/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Vincent F. Sarmiento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. David Benavides <br />Michele Martinez <br />Roman Rayne <br />Sal Tinajero <br />October 29, 2015 <br />ADDENDUM NO. ONE <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />P.O. Box 1988 M -36 <br />Santa Ana, California 92702 <br />www.santa•ana.oro <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />SUBJECT: PROJECT NO. 16 -6868: WARNER INDUSTRIAL COMMUNITY <br />PAVEMENTIMPROVEMENTS <br />The following clarifications have been made for the subject project: <br />Pre -Bid Conference <br />1. Notes from Pre -Bid Conference held at City Hall - Ross Annex, Third Floor, 20 <br />Civic Center Plaza, Santa Ana, CA 92701 on October 27, 2015 at 9:00am: <br />• What is the scope of work and project area? <br />The project area includes 3.25 centerline miles (approximately 840,000 <br />square feet) of local industrial streets located east of Harbor Boulevard, west <br />of Fairview Street, north of Segerstrom Avenue, and south of Edinger <br />Avenue. The scope of work includes reconstruction of asphalt pavement, <br />removal & replacement of Portland cement concrete curbs, gutters, <br />sidewalks, driveway approaches, & curb ramps, adjustment of surface utility <br />covers to finished grade, signing .& striping, and installation of vehicle <br />• What is the engineer's estimate? <br />The engineer's estimate is $4,100,000. <br />o When will the project be awarded? <br />Bids shall be valid for 180 working days after the opening of the bids. The <br />award, if made, will be made within this time period. Construction of the <br />project is contingent upon (a) the formation of an assessment district under <br />the Municipal Improvement Act of 1913 (Division 7 of the California Streets <br />and Highways Code), which will require approval by the owners of the <br />affected property of the levy of assessments pursuant to an assessment <br />ballot procedure that will commenced after the receipt of bids and <br />SANTA ANA CITY COUNCIL <br />Miguel A. Pulido I Vincent F. sarmlento i Mlchele Martinez Angelica Amezcua P. David aenevitles I Roman Rayne r Sal Thayer. <br />Mayor I Mayor Pro Tom, Ward 1 i Ward 2 Ward 7 Ward 4 , Ward 5 I Ward 6 <br />MPulidoraluanta -ana ore tSS_aa fen o[dlsanta ana om I MMgaly CNSanta- ano.oro &Z'29 pigngvd ana RRevne/ovsanla- a_pa.g_rg j STlnelero(dsanta- ana ore <br />
The URL can be used to link to this page
Your browser does not support the video tag.