Laserfiche WebLink
PAGE 2 <br />ADDENDUM NO. ONE <br />PROJECT NO. 16 -6868: WIC PAVEMENT IMPROVEMENTS <br />determination of the lowest responsive, responsible bidder and (b) the <br />issuance and sale of limited obligation improvements bonds (the "Bonds ") for <br />the assessment district to be secured by such assessments. The issuance <br />and sale of such Bonds is anticipated to occur in June 2016. <br />• How will construction be phased? <br />Access to each business must be maintained at all times; therefore, <br />construction may occur during nights and weekends as directed by the <br />Engineer. Excavation of existing pavement and base paving shall be <br />completed within 24 hours; therefore, construction may be phased in block <br />segments as directed by the Engineer. For bidding purposes, the Contractor <br />shall include the aforementioned constraints in the various bit items and no <br />additional compensation will be allowed therefore. <br />What are the conditions of the project labor agreement between unionized <br />and non- unionized workers? <br />The City of Santa Ana does not have any union requirements. <br />2. See attached pre -bid conference sign -in sheet. <br />All other terms and conditions remain the same. <br />FOR THE CITY OF <br />"A7 ANA <br />Edwin "William" Galvez, P. E. <br />City Engineer <br />SANTA ANA CITY COUNCIL <br />Miguel A. PUlitlo j Vincent F. Samiianto <br />Michele Marlines <br />Angelica Ani=aa <br />P. David 6enavides <br />'�, Roman Rayne <br />Sel Tinajaro <br />Mayor Mayo== 1 <br />Word2 <br />Wartl3 <br />Ward4 <br />Ward <br />Ward <br />MPulitloM JsMy +�l( },�1spr�JSJnla- ano.aro VSarml� ,oro ; <br />MMatlinezl�se its ana or_�n �o <br />A,yli4 egy Qsasantaarreoro <br />DBanavide9(M3a1a- ana.or9 <br />1 88@ypgL@s na_- ena.orlt ! <br />ST'ne'ero0sanla-enagrri <br />23A -30 <br />