Laserfiche WebLink
Section 5 <br />Mitigation Measures <br />No mitigation measures required. <br />Level of Impact after Mitigation <br />Alternative 1: No adverse impact <br />Alternative 2: No adverse impact <br />Alternative 1 No adverse impact <br />Alternative 4. No adverse impact <br />IMPACT AIR-2: Would the project violate any air quality standard or <br />contribute <br />Alternative 1: No Federal Action/No, Project <br />Under Alternative 1, the project would not be implemented. There would not be <br />any regional or local construction emissions or any regional or local operational <br />emissions generated within the project area that could have the potential to be in <br />conflict with S,CAQMD air quality standards. The South Coast Basin Would <br />continue to be a State and Federal non-attainment area for PM1 0, PM2.5 and <br />ozone. <br />Alternative 2: Proposed Project <br />Regional Construction Emissions <br />The Proposed Project would occur in eight non-overlapping phases. Some <br />phases would include more than one activity and each activity would have <br />elements that would require a different mix of construction equipment. The <br />construction equipment descriptions and activity durations were input into <br />CalEEMod to develop emissions estimates for each phase or activity. The <br />emissions generated from construction operations from the Proposed Project are <br />shown in Table 5. These values are compared with the SCAQMD daily <br />construction emission thresholds to determine if a significant air quiality impact <br />would occur. All estimated emissions would be less than the SCAOMD <br />significance thresholds. <br />Mid Basin Centennial Park Jlr& Project Final EIR 5-22 <br />b <br />