Laserfiche WebLink
Section 5 <br />selected because it is assumed that there would be no sensitive receptors within <br />50 meters of the well sites during drilling. As shown in Table 6, all estimated <br />emissions would be less than the SCAQMD significance thresholds. <br />Table 6: Proposed Project Localized Construction Emissions <br />Construction Activity <br />Voc <br />Emissions (Pounds/Day) <br />Co <br />PM10 <br />PM2.5 <br />Well Redevelopment <br />4 <br />NOx <br />Co <br />PM10 <br />Pli <br />Project maximum daily <br />81 <br />64 <br />7 <br />2 <br />on-site emissions <br />Significant Impact? <br />No <br />No <br />No <br />SCAQMD Scireerrdng <br />83 <br />753 <br />12 <br />4 <br />Thresholds <br />Exceed Threshold? <br />No <br />No No <br />No <br />NQu= Milrogafloxides CO <br />- carbon monaxide <br />PM,o and Pioz particulate matter <br />NoW,I <br />S I ource of thresholds: South Coasi Air 0iiality Management <br />Dstrii 2009, for SRA 22. 500 meters 1 -afire site <br />Regional Operational Emissions <br />The primary operational activities that would emit criteria pollutants would be the <br />injection well and monitoring well redevelopment activities. Assuming <br />redevelopment of each well every two years, operational emissions were <br />estimated assuming the redevelopment of an average of two and one-half wells <br />per year, that is, two injection wells each year and the monitoring well every other <br />year- The well redevelopment emissions were calculated in CalEEMod as <br />construction emissions because the operation of the proposed project involves <br />the use of construction equipment. As shown in Table 7, all estimated emissions <br />would be less than the applicable SCAQMD CEQA significance thresholds. <br />Table 7: Proposed Project Regional Operational Emissions <br />Phase <br />Voc <br />li <br />Co <br />PM10 <br />PM2.5 <br />Well Redevelopment <br />4 <br />41 <br />is <br />1 <br />1 <br />Significance Threshold <br />55 <br />55 <br />550 <br />150 <br />55 <br />Significant Impact? <br />No <br />No <br />No <br />No <br />No <br />Local Operational Emissions <br />The localized effects from the on-site portion of daily operational emissions for <br />the Proposed Project were evaluated at sensitive receptor locations potentially <br />Mid Basin Centennial Park Ac&n Project Ii EIR 5-24 <br />2 <br />