My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />impacted by the Proposed Project. As shown in Table 8, all estimated emissions <br />would be less than the applicable thresholds. <br />Table 8- Proposed Project Local Operational Emissions <br />Phase <br />NOx <br />co <br />PM10 <br />PM2.5 <br />Well Redevelopment <br />40 <br />17 <br />1 <br />1 <br />Significance Threshold <br />83 <br />753 <br />12 <br />4 <br />Significant Impact? <br />No <br />No <br />No <br />No <br />Alternative 3: Reduced Intensity Project <br />The following analysis evaluates regional construction emissions., localized <br />construction emission, regional operational emissions and localized operation <br />emissions generated from Alternative 3. <br />Regional Construction Emissions <br />As shown in Table 9, all estimated emissions would be less than the applicable <br />SCAQMD CEQA significance thresholds. <br />Table 9: Alternative 3 Estimated Regional Daily Construction Emissions <br />(Pounds /Day) <br />Phase <br />Voc <br />NOx <br />Co <br />PM10 <br />PM15 <br />Phase 1- Install pipeline <br />1 <br />17 <br />17 <br />3' <br />1 <br />Build Shared Structures <br />Improve Heritage Site <br />Phase 2- Well Drilling <br />4 <br />51 <br />48 <br />3 <br />2 <br />Phase 3 -4- Well Drilling <br />4 <br />51 <br />48 <br />3 <br />2 <br />Phase 3 -4- Well <br />2 <br />30 <br />17 <br />1 <br />1 <br />Development <br />Total Phases 3 -4 <br />6 <br />82 <br />65 <br />4 <br />3 <br />Phase 6- Well <br />2 <br />30 <br />17 <br />1 <br />1 <br />DrillinglDevelopment <br />Phase 7- Monitoring Well <br />4 <br />51 <br />48 <br />3 <br />2 <br />Drilling and well equipping <br />Phase 7 Well equipping <br /><0.5 <br />7 <br />5 <br /><0.5 <br /><0.5 <br />Total Phase 7 <br />5 <br />58 <br />53 <br />3 <br />2 <br />Phase 8- Well Equip /Paving <br />3 <br />20 <br />22 <br />a <br />2 <br />a ° Mid Basin Centennial ParkI i jl�3y 11 Project Final EIR 5' -25 <br />11 lr ''1111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.