My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />Significance Threshold <br />75 <br />100 <br />550 <br />150 <br />55 <br />Significant Impact? <br />No <br />No <br />No <br />No <br />No <br />No aftimlies p.., posGd Ux Flia,in f, <br />— <br />Skate Nark wmstruc,ioo Tinfissi on s wat I td be <br />IlogIIGIbb al IT] Pal ed [a the wall -Ijil I I fig and ep,ppof; euInsions and are rid <br />$h 0"n <br />BOLD ogive Fxceeds SCACMD thrpffhnNd <br />See, Appenclix B For CaEEMod Modfa faulpifls <br />Localized Construction Emissions <br />Localized impacts from the Alternative 3 would be the same as the Proposed <br />Project, As shown in Table 6 localized emissions of NO2, CO, PM10 and PM2.5 <br />would not exceed the thresholds and potential localized air quality impacts would <br />be less than significant. <br />Regional Operational Emissions <br />The operational emissions were estimated assuming the redevelopment of an <br />average of two wells per year, that is, two injection wells one year and one <br />injection well and the monitoring well the alternate year. Maximum daily <br />emissions for Alternative 3 project operations would be the same as the <br />Proposed Project. All estimated emissions Would be less than the applicable <br />SCAQMD CEQA significance thresholds. <br />Localized Operational Emissions <br />The localized effects from the on-site portion of daily operational emissions for <br />Alternative 3 would be the same as the Proposed Project. All estimated <br />emissions would be less than the applicable SCAQMD CEQA significance <br />thresholds. <br />Alternative 4: Pipeline Design Alternative <br />The following analysis evaluates regional construction emissions, localized <br />construction emission, regional operational emissions and localized operation <br />emissions generated from Alternative 4. <br />Regional Construction Emissions <br />The regional daily construction daily emissions for Alternative 4 would be the <br />same as the Proposed Project, All estimated emissions would be less than the <br />applicable SCAQMD CEQA significance thresholds. <br />Localized Construction Emissions <br />The localized construction emissions for Alternative 4 would be the same as the <br />Proposed Project. All estimated emissions would be less than the applicable <br />SCAQMD CEQA significance thresholds. <br />Mid Basin Centennial Park �Jg6pnfj Project Final EIR 5-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.