Laserfiche WebLink
Section 5 <br />Table 10: Proposed Project Regional Construction Emissions (TonsNear) <br />Phrase <br />Voc <br />Nox <br />co <br />Pi <br />PM2.5 <br />Phase 1- Install pipeline <br />0.06 <br />0.70 <br />074 <br />0.05 <br />0.04 <br />Build Shared Structures <br />10 <br />10 <br />100 <br />100 <br />100 <br />Improve Heritage Site <br />Phase 2- Well Drilling <br />0.03 <br />0.30 <br />0.24 <br />0.01 <br />0.01 <br />Phase 3- Well Drilling and <br />0.09 <br />0.42 <br />0.31 <br />0.02 <br />0.02 <br />Development. <br />Phase 4- Well Development <br />0.03 <br />0.42 <br />0.31 <br />0.02 <br />0.02 <br />and Development <br />Phase 5- Well Development <br />0,03 <br />0,42 <br />0.31 <br />0.02 <br />0.02 <br />Phase 6- Well <br />0.01 <br />0.12 <br />0.07 <br /><0,005 <br /><0.005 <br />Drilling/Development <br />Phase 7- Monitoring Well <br />0.03 <br />0.32 <br />0.26 <br />0.01 <br />0.01 <br />Drilling, equip and skate park <br />improvements <br />Phase 8- Well Equip /Paving <br />0.02 <br />0.06 <br />0.07 <br />0.02 <br /><0.005 <br />Total <br />0.24 <br />2.76 <br />2.31 <br />0.18 <br />0.12 <br />General Conformity de <br />10 <br />10 <br />100 <br />100 <br />100 <br />rninimis lin itslNEPA <br />thresholds in tons per year <br />Significant Impact? <br />No <br />No <br />No <br />No <br />No <br />See Appendix d for CeIEEMod Model outputs <br />Regional Operational Emissions General Conformity Analysis <br />The total annual criteria pollutant operational emissions for the Proposed Project <br />are shown in Table 11 and are compared with the General Conformity de rrinimis <br />annual thresholds. As shown in Table 11, annual emissions of all pollutants <br />would be less than the applicable General Conformity thresholds. <br />Table 111: Proposed Project Estimated Annual Operation Emissions <br />(Tans /Year) <br />Phase <br />Voc <br />NOx <br />co <br />PMtID <br />PM2.5,; <br />Well Redevelopment <br />0.04 <br />0,40 <br />0.18 <br />0.01 <br />0.01 <br />General Conformity de minr'mis <br />10 <br />10 <br />100 <br />100 <br />100 <br />limitsNEPA, thresholds in tons per year <br />Significant impact? <br />No <br />No <br />No <br />No <br />No <br />Mid Basin Centennial Park '--j C n iProject Final EIR 5 -32 <br />