Laserfiche WebLink
Section 5 <br />National Pat* Service Centennial Park Open Space Requirements <br />The National Park Service through previously executed a grant deed restrictions <br />is required to ensure that Centennial Park is maintained for open space and <br />recreation activities and that any land uses or activities proposed at the park <br />would riot result in in the loss of usable open space or interfere with existing <br />recreation facilities. The following analysis evaluates potential open space <br />impacts associated with the construction and operation of the Proposed Project, <br />Injections Wells and Associated Pipelines <br />The proposed injection wells and water supply pipeline would be placed <br />underneath existing parking areas and roadways. Existing transformers at <br />Centennial Park would be enhanced to provide power to the injection wells and <br />shared recreation/communication structures. There would be no permanent loss <br />of open space associated with the operation of these facilities. The construction <br />operations for the injection wells have been phased where no construction <br />activities would exceed a six month construction period in any one location. <br />during construction operations there would be no temporary loss of usable open <br />space, <br />Shared Recreation/Communication Structures <br />Two above ground shared recreation/communication structures have been <br />proposed at Centennial Park to be jointly used by the City of Santa Ana and <br />OCWD, Shared Structure 1 would be located on an existing asphalt area <br />immediately adjacent to the north end of the soccer field complex. This area <br />provides no usable open space and has been a planned location for a new <br />restroom and changing area to support the Soccer field complex. Shared <br />Structure 1 would consist of 1,050 square feet of area and Would include a 220 <br />square foot public restroom, 550 square foot changing room for soccer teams <br />and 280 square foot utility/communication system room. As part of the <br />improvements, a new 10 foot wide and 200 foot long ACA approved sidewalk <br />would be constructed from the parking area to the soccer complex. The <br />construction of Shared Structure 1 would not result in the permanent loss of <br />usable open space and would expand existing park and recreation amenities at <br />Centennial Park, <br />Shared Structure 2 site is located immediately north of the Centennial Park skate <br />park. Presently, located on the site is 576 square foot structure that includes a <br />degraded public restroom and covered standing area. The existing restroom <br />structure Would be demolished and replaced with a new 596 square foot <br />structure that would include a 212 square foot public restroom, a 178 square foot <br />park ranger office and a 206 square foot utility/communication system room. A <br />Mid Basin Centennial Park 2j6i Q24JProject Final EIR 5-140 <br />