My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />improvements at Heritage Museum would enhance existing recreational facilities <br />at Centennial Park and at the Heritage Museum. <br />City of Santa Ana Zoning Code <br />In accordance with Zoning Code public utility facilities are a permitted land use in <br />areas that are zoned Open Space. The Propose Project improvements at <br />Centennial Park would not be in conflict with City of Santa Aria Zoning Code. <br />City of Santa Ana General Plan <br />The following its a consistency evaluation of the Proposed Project with relevant <br />General Plan policies and objectives, <br />• Ensure that the impacts of development are mitigated. <br />• Protect the community from incompatible land uses. <br />• Support identification and development of new sources of water. <br />• Encourage multiple use of water and other natural facilities such as <br />reservoirs and flood control channels. <br />• Conservation Element Objective 2.1: Conserve water resources in <br />commercial, resident0l and recreation uses. <br />• Develop local water recycling programs and cooperate with regional <br />recycling efforts. <br />As identified in the Draft EIR all potential significant impacts to Centennial Park <br />and the surrounding area associated with the construction and operation of the <br />Proposed! Project have been reduced to a less than significant level. <br />To avoid potential incompatible land uses conflicts the components of the <br />Proposed Project would be located below existing parking areas and roadways. <br />The Proposed Project would provide additional 12 MGM of groundwater recharge <br />capacity within the Orange County Groundwater Basin- The increase recharge <br />capacity Would provide additional water supplies for the City of Santa Ana. <br />To help conserve potable water, the Proposed Project has been designed to <br />allow the well water from the back flushing of the injection, wells to be discharged <br />into Centennial Lake. The discharging of the well water would reduce the <br />amount of potable water the City of Santa currently discharges into the <br />Centennial Lake to maintain its water level'. <br />The water supply for the proposed injection wells would be advanced treated <br />recycled water from OCWD's Groundwater Replenishment System. The use of <br />the recycled water would help to reduce the regiional demands for imported water <br />supplies. <br />Mid Basin Centennial Park roject Final EIR 5-139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.